cvrr5809 wrote:Reliability is also a BIG part of the equation, and when it comes to PAR, it's not normally in their vocabulary. Paying a $1000 per car for the product to stay on one mode of transportation for its whole journey would be was less stressful to the suppliers and consumers alike. Less middle men means less hands and less potential damage and spent time which ultimately offsets such a cost per car. Fluidity last time I checked.
First, Pan Am from 'Keag to NMJ was just as reliable as NMJ-WTVL is. So there are no significant reliability gains in the current routing. I'm also not sure how fewer middle men means lower chance of damage? It's not like you're repacking the stuff, its a box car operating on consistent track (not the same track, consistent track, where 25mph track all meets the same standards and 10mph track all meets the same standards, unlike roads that may be poor and bumpy but still have a high speed limit). I'm not saying consistency isn't important in a supply chain, but ultimately the old adage "cash IS king" trumps, and you're paying an additional $1000 for an extra (if I did my math right) 22-23 miles.
cvrr5809 wrote:It's a damn shame to see the NMJ-Keag mileage virtually dead to road trains. It could be a viable artery in the right hands. Pan Am is what's bad for Pam Am! Once again reliability and consistency, and 10mph over a stretch this long will not sustain such demands!
As we've agreed, reliability is more important than velocity. If the price is right an extra 24 hours of transit time is more than acceptable. And like I said earlier, if its JIT you're looking for you best opt for a 53' dry van. If you want economy a 50' F plate is adequate. This is why paper mills are customers and Hannaford Brothers isn't.
The long and short of my point is that its already being borne out.
MABA/BAMA (or its predecessor/supplemental symbols) were consistently 40-60 cars.
NMWA/WANM is now, based on what I see, consistently in the 30-50 car range. In a 14 month span they've bled 10 cars off their Irving interchange trains. One can only assume that this traffic has either moved to truck which is now price competitive, or moves over CM&Q to Montreal, which is now price competitive. Short term their are minimal downsides and a pretty great reduction in costs associated with an EMRY-CMQ-ST routing, but long term (and maybe not that long term considering we're only 14 months in) its going to cost Pan Am business, offer it to the competitor who's squeezing their prices, and put the NMJ-WTVL segment in the same death spiral that NMJ-Keag is currently in.