by atholrail
Went and checked on the status of the Newark America spur in West Fitchburg today. The spur is all complete, with only some ballast needed were they put down a new snap panel. They even added a new make shift derail at the top of the hill. Past that there is a switch with both tracks going inside the facility. Still not sure what they are gonna be hauling in/out, but they sure are currently doing a big business with tons of trucks in/out.
You do not have the required permissions to view the files attached to this post.
https://www.flickr.com/photos/[email protected]/" onclick="window.open(this.href);return false;
------------------------------------------------------------------
http://photos.nerail.org/show/?order=by ... =atholrail" onclick="window.open(this.href);return false;
------------------------------------------------------------------
http://photos.nerail.org/show/?order=by ... =atholrail" onclick="window.open(this.href);return false;