The cited report was issued ten years ago, so costs are now comparatively higher.
The cost breakdown in the report for the demolition does not seem to include a cost for the extensive re-grading and storm water management that may be required to restore the site to a park let alone future housing sites. The landscaping cost seems low. The engineering cost is 16% of the total cost for a demolition?
The cost breakdown for the restoration does not seem to include a cost for the sub-grade waterproofing behind the existing structure and the storm water management that would be required.
The cost breakdown in the report for the demolition does not seem to include a cost for the extensive re-grading and storm water management that may be required to restore the site to a park let alone future housing sites. The landscaping cost seems low. The engineering cost is 16% of the total cost for a demolition?
The cost breakdown for the restoration does not seem to include a cost for the sub-grade waterproofing behind the existing structure and the storm water management that would be required.