Hey all...
I was just wondering, why does it take 4-5 years for only 340 new PATH cars to be built. I would understand if it was a radically different hi-tech design, or if they were long distances coaches, but I don't understand why it would take so long for PATH cars to be constructed and shipped. Anyone with any experience have any input?
Thanks in advance.
I was just wondering, why does it take 4-5 years for only 340 new PATH cars to be built. I would understand if it was a radically different hi-tech design, or if they were long distances coaches, but I don't understand why it would take so long for PATH cars to be constructed and shipped. Anyone with any experience have any input?
Thanks in advance.