by SST
SST wrote: ↑Mon Sep 06, 2021 8:04 am I'll have to take a look back there. There was power line and tower construction back there at GJ for awhile. There was concrete blocks there back then. Without a perfect view from Rt400, it looks clear but can't tell further up towards the switch. Visitation is needed. Something to do.Finally got out to the Y at GJ to see if they cleared the concrete blocks. Googles aerial photo shows the blocks. But since the new towers and power lines are completed, everything has been removed. Track actually looks new and welded.![]()
This picture is at the south end of the Y looking north. Further Behind me the track resumes jointed rail but from this switch to the GJ switch is welded. The lock on this switch says, “Track out of service.”

This photo is further up the eastern track with GJ in sight. All is clear.