by Falmouth Secondary to Otis
According to the MassDOT bid for the Red Brook Harbor RR crossing project new 115RE rails on new ties with pandrol fastening system and rubber rail seal were to be used along with new signal conduits to be installed. The crossing signals / controls already were replaced in October of 2019 and the existing rail weight on the Falmouth Secondary is currently 107 Lb. dated 1915