 #1544965  by johnpbarlow
 
Pictures below of remaining few hundred yards of track to be laid at Milford as of Sunday 6/7/20.
Attachments:
The view NE from Vernon St
The view NE from Vernon St
G&U Milford Yd track Vernon St 060720.jpg (674.1 KiB) Viewed 3184 times
The view southwest from S Cedar St
The view southwest from S Cedar St
G&U MIlford Yd track S Cedar St 060720.jpg (627.74 KiB) Viewed 3185 times
The view NE from S Cedar St to Depot St
The view NE from S Cedar St to Depot St
G&U Connection to CSX Milford Branch Milford 060720 3.jpg (772.12 KiB) Viewed 3185 times
 #1544979  by Trinnau
 
Definitely rebuilding the crossing. Those are switch timbers in the photo. You can tell because they have staggered lengths and there is a set of long timbers that extend toward the other track where a switch stand would go. So they must be installing a new switch there with 2 tracks across the road.
 #1544981  by bostontrainguy
 
Thanks guys but you are confusing me a bit here. The track to the right is the CSX line not the one being built. And if that is going to be a switch then I guess there will be a three track crossing at Cedar Street.

No trace of the elusive wye, right? Was there ever a yard here?
 #1545013  by craven
 
There is a Freight Yard across Depot St. Milford, where the line from Framingham once ran. You can see the RR Crossing sign on the right side in Johns last picture. The next week should reveal where the second switch at S. Cedar St. is pointing to.
 #1545209  by Cosmo
 
bostontrainguy wrote: Mon Jun 08, 2020 11:16 am Thanks guys but you are confusing me a bit here. The track to the right is the CSX line not the one being built. And if that is going to be a switch then I guess there will be a three track crossing at Cedar Street.
That's correct.
 #1545507  by Cosmo
 
The track geometry is going to be interesting,
looks like the siding will be sandwiched between the G&U and CSX mains.
It's aimed like it will tie back into the CSX line further south (toward Bellingham.)
I wonder how far south it will go before it ties back in?
 #1545526  by bostontrainguy
 
Cosmo wrote: Sun Jun 14, 2020 10:13 pm The track geometry is going to be interesting,
looks like the siding will be sandwiched between the G&U and CSX mains.
It's aimed like it will tie back into the CSX line further south (toward Bellingham.)
I wonder how far south it will go before it ties back in?
So it's the CSX track that will be doubled and not the G&U? Wonder why they didn't install a second switch on the CSX track when they put in the other one? Maybe this is actually going to be a siding for a business being built inside the "wye"? They don't really need a runaround here since they can do that in Milford Center which will be interesting to see.
 #1545768  by johnpbarlow
 
As of Tuesday 6/16/20, it appears the construction of the Hopedale to Milford track connecting to CSX Milford Branch is complete. A regulator manicures the lead to the turnout and track has been constructed / rehabbed at the Vernon St crossing in Milford - results look superb! Obviously G&U invested quite a bit of $ and effort to implement this connection to an unused CSX line and must have big plans for this extension. We shall see!
Attachments:
G&U Regulator at CSX connection S Cedar St Milford 061620 3 small.jpg
G&U Regulator at CSX connection S Cedar St Milford 061620 3 small.jpg (284.06 KiB) Viewed 2078 times
G&U west view Vernon St Milford 061620 small.jpg
G&U west view Vernon St Milford 061620 small.jpg (383.75 KiB) Viewed 2078 times
G&U east view Vernon St Milford 061620 small.jpg
G&U east view Vernon St Milford 061620 small.jpg (365.93 KiB) Viewed 2078 times
 #1545844  by johnpbarlow
 
Ops questions:
1. What days does G&U run out of N Grafton to W Upton and/or Hopedale? Do they operate daily or as needed Monday through Friday?
2. Related question: what days does CSX B722 (Sunday through Thursday Westborough to Worcester and return local) service G&U at N Grafton - as needed? Does B722 drop typically inbounds to G&U from Q436 on its way to Worcester and then pick up outbounds for Q437 to Selkirk on its return east to Westborough? The reason I ask is on Tuesday 6/16/20, B722 ran west through N Grafton with a short consist without stopping at G&U at around 2PM.

Thanks.
Attachments:
CSX B722 wb N Grafton 061620 2 small.jpg
CSX B722 wb N Grafton 061620 2 small.jpg (227.29 KiB) Viewed 1931 times
 #1545866  by Trinnau
 
johnpbarlow wrote: Fri Jun 19, 2020 3:56 am 2. Related question: what days does CSX B722 (Sunday through Thursday Westborough to Worcester and return local) service G&U at N Grafton - as needed? Does B722 drop typically inbounds to G&U from Q436 on its way to Worcester and then pick up outbounds for Q437 to Selkirk on its return east to Westborough? The reason I ask is on Tuesday 6/16/20, B722 ran west through N Grafton with a short consist without stopping at G&U at around 2PM.
I don't know for sure, but the switch for the G&U off the Worcester Main is trailing point eastbound. So the eastbound trip is likely when they work the G&U. Cars bound for Selkirk are then hauled east before being sent back to west.
 #1545921  by QB 52.32
 
That local, Mr. Barlow, appears to be out of Westborough, likely heading west to run around their train and work back east (B723? -I thought the Worcester-Westborough-Framingham road turn was B722?) What would be telling is whether the springs on those cars were compressed, indicating they were loads.

In terms of describing the Milford branch, it is "used", (not moribund) with a coupla-few hundred annual carloads for the two remaining receivers.