Lots of activity at Howard's this week. Yesterday morning there were six empty centerbeams on the siding there (the siding which leads to Bulloch Fertilizer). There were at least five full centerbeams, maybe more, waiting to ship pushed back into Howard's. No sign of power anywhere. Went on down to Bulloch Fertilizer and saw one hopper. Later that afternoon, saw the 2024 at Howards backed up to the full centerbeams, but couldn't hang around. I assumed it would pull out the loaded centerbeams, head up the Bulloch Fertilizer spur, back in to the siding, hook up the empties, and then back the empties in to Howard's, then head out with the loaded. I think everything but the last happened. Must have been some shunting job.
When I went back today, there were two empties left on the siding, some loaded centerbeams on the Howard's secondary along with the BF hopper, and the 4 empties from yesterday backed into Howards and loaded. The power wasn't there; when I got home, I heard it heading back up from I assume Reeves. That's going to be quite a load heading back up to Dover later. Figure 10 centerbeams, the hopper, and whatever was at Reeves or down in Metter.
Next stop, Willoughby
~el Jefe ::
RAILROAD.NET Site Administrator/Co-Owner; Carman at
Naugatuck Railroad
YouTube Instagram Facebook