 #1588932  by CRail
 
As I type this 1064 is at Readville, not on a set. It is to be used only as a double header, which I interpret to mean it must be tested before being accepted into regular service.
 #1589075  by MBTA F40PH-2C 1050
 
1064 added to 2029/1717 set 1/10/22

The 1054 has been having an issue with its locomotive hand brake. Would not be surprised if another issue developed. These rebuilds are coming back worse than when they left. embarrassing program