by Pilbara Rail
Some of the SD40 units got modified when they arrived.
All of them will fit through the car dumpers. A unit did have the wrong fan installed and copped a bit of damage when it was 'forced' through the dumper cells.
Even with the SD70ACe/LC units we have, they did not fit through Car Dumper 1 or 2. The new dumper for the West Yard located on Finucane Island is okay, and so is Dumper 3 at Nelson Point. But to keep things simple, all SD70ACe/LC units were banned from the Nelson Point dumpers and had an ATP mod to prevent them getting too close.
Car Dumper 1 has just been fully rebuilt, (remember this was the dumper from the Oroville Dam job) and they'll fit through it now. Car Dumper 2 is currently being rebuilt, when it is the entire BHP fleet will again work through the dumpers at Nelson Point.
All of them will fit through the car dumpers. A unit did have the wrong fan installed and copped a bit of damage when it was 'forced' through the dumper cells.
Even with the SD70ACe/LC units we have, they did not fit through Car Dumper 1 or 2. The new dumper for the West Yard located on Finucane Island is okay, and so is Dumper 3 at Nelson Point. But to keep things simple, all SD70ACe/LC units were banned from the Nelson Point dumpers and had an ATP mod to prevent them getting too close.
Car Dumper 1 has just been fully rebuilt, (remember this was the dumper from the Oroville Dam job) and they'll fit through it now. Car Dumper 2 is currently being rebuilt, when it is the entire BHP fleet will again work through the dumpers at Nelson Point.