Further proof as I've said regarding the Castleton Bridge. They are now working on the west end. This work has been going on for at least 3 years, all while maintaining the 30 MAS timetable speed. No temporary speed restrictions.

There is no chance the the B&A freight moves to the old B&M line.

https://www.railpictures.net/photo/768127/
  by BandA
 
Is the railroad bridge supposed to be painted? It looks awful next to the $$Thruway bridge.
  by QB 52.32
 
roberttosh wrote:All the money in the world will not be able to address most of the issues I brought up and even if it could, CSX is never going to run a mainline out of Selkirk to New England by way of Rotterdam Jct, that in the future may require up to 10, 12, 14, or more backup moves per day creating an unprecedented bottleneck on a busy main line, especially when the existing B&A route is an unimpeded high speed route that checks all the boxes.
Certainty only comes with death and taxes. When you add strategic needs, political power and possibility; resources from infrastructure funding, sale of assets, and available horse-trading; a 25-year planning horizon; PSR operating philosophy; and, importantly, options, there is possibility at this time for creating utility in PAS for CSX to move some degree of east-of-Springfield traffic over from the B&A.

With history providing a possible clue to the future, a look to past examples of where freight was moved to make way for passenger rail; the evolution of Boston metropolitan rail freight, first addressed strategically some 60 years ago, and with necessary on-going strategic planning during the past 34 years; and, the activity leading up to a deal, the deal itself for sale of the B&A from CP-22 to CP-45, and then the results coming from the deal also provides some credence to the possibility.

In raising the issue of an "unprecedented bottleneck on a busy main line", the possibility of getting 38, 48, 58 freight and passenger trains in, out and through Worcester in the future also has to be part of that discussion. And, might a mix of resources and horse-trading, PSR operating philosophy, and options mitigate a potential Rotterdam Jct. bottleneck should CSX move B&A traffic over to PAS?

Image
Screen shot from John DiPietro's 3/17/21 Youtube video

[
  by roberttosh
 
That image repeats itself all day long and is hardly surprising as that is where CSX currently does most of its' manifest pickups and drop-offs and is pretty much their de facto Worcester yard. This is not main line congestion but is more normal terminal operating practice and once they get PAR you can be sure that 426 and 427 will not be stopping and switching at that location.