 #1474772  by nydepot
 
Conrail ZTS maps (1986/87) show PS&N track on the south side of the PRR main as in service on the east side of the Shawmut wye and some team tracks on the west side of the wye.

When did this track stop being used and when was it ripped out?

Thanks,

Charles
Last edited by nydepot on Fri Jun 01, 2018 1:02 pm, edited 1 time in total.
 #1474841  by jr
 
This track was primarily used to serve the Tile Plant for raw materials supply. They put in an unloading shed on the mainline, circa 1980, with a pneumatic pipe running under E. State Street to the Plant.

The remains of the Shawmut were abandoned and torn up shortly thereafter.

JR
 #1475041  by thebigham
 
My pics of the PS&N tracks still in place in Olean in Nov/Dec 1986.
Attachments:
Bridge over Olean Creek
Bridge over Olean Creek
IMG_20151210_0004.jpg (256.07 KiB) Viewed 3494 times
IMG_20151210_0005.jpg
IMG_20151210_0005.jpg (298.95 KiB) Viewed 3494 times
East State St. overpass. It has been filled in.
East State St. overpass. It has been filled in.
IMG_20151210_0003.jpg (263.83 KiB) Viewed 3494 times
 #1475042  by thebigham
 
By September 1987, the PS&N tracks had been pulled up in Olean
Attachments:
Former connection with CR
Former connection with CR
IMG_20151210_0006.jpg (362.85 KiB) Viewed 3492 times
East State St. overpass can hardly be seen
East State St. overpass can hardly be seen
IMG_20151210_0007.jpg (289 KiB) Viewed 3492 times
Bridge over Olean Creek
Bridge over Olean Creek
IMG_20151210_0008.jpg (239.71 KiB) Viewed 3492 times
 #1475100  by lvrr325
 
From what I see on the map images the ROW has become a rail trail, including a portion to the southwest that looks to have served some customers along S. Clinton and Barry St. although the current trail ends before that, at Fulton St. where it meets Adams. The overpass labeled filled in above does not appear to be so.
 #1475141  by nydepot
 
Correct.
lvrr325 wrote:From what I see on the map images the ROW has become a rail trail, including a portion to the southwest that looks to have served some customers along S. Clinton and Barry St. although the current trail ends before that, at Fulton St. where it meets Adams. The overpass labeled filled in above does not appear to be so.
 #1475440  by joesbag
 
On the Dresser-Rand property, it looks like one of their large outbuildings was a portion of a roundhouse. Is this the case and was it the Shawmut's? Thanks
 #1475443  by nydepot
 
That was the Pennsy shops.
joesbag wrote:On the Dresser-Rand property, it looks like one of their large outbuildings was a portion of a roundhouse. Is this the case and was it the Shawmut's? Thanks
 #1475519  by jr
 
Thanks to several friends, we have developed some more definite dates for the Tile Plant / Shawmut trackage in the earlier posts.

The new Tile Plant siding, at MP 72.1 on the mainline, went into service on September 1, 1977. (ref. Conrail General Order 115)

The Shawmut trackage to the back side of the TIle Plant was in service until approximately late 1982 or early 1983 (ref. the recollections and photos of at least two people who were "right there")

Therefore my recollection of them abandoning the former Shawmut "shortly" after the new siding went in, was not correct.

JR