 #342993  by the1jp
 
As I left town for work in Roch., Isaw that some stone had been removed from the big pile in the Avon yard and that the two silver side delivery hoppers were in the siding up the hill!
Does anyone know where the stone is going?
Thanks JP
 #343549  by Luther Brefo
 
the1jp wrote:As I left town for work in Roch., Isaw that some stone had been removed from the big pile in the Avon yard and that the two silver side delivery hoppers were in the siding up the hill!
Does anyone know where the stone is going?
Thanks JP
It is most likely here for the springtime MOW work (think welded rail). The ties are here and piled high. The gondolas on the MOW siding are loaded with tie plates.

 #344096  by railwatcher
 
It wasnt for the CWR job.