by S1f3432
This timeline of events on Conway Branch and CSRR may be of interest. Info culled from 470 RR Club newsletters and a letter to the editor of Railfan Magazine from Dwight Smith appearing in the Fall 1975 issue.
1-70. Dover- Intervale local restored to former status: running north as DI-1 M-W-F, laying over at North
Conway and returning to Dover as ID-2 T-T-S, service beyond North Conway to Intervale only as
needed.
5-70. 470 RR Club members invited to participate in weekend work sessions on 47 (7470) in storage
At Rigby Yard in South Portland.
2-71. MEC-B&M interchange at Intervale handled it’s first load in over a year when hi-wide load boiler
from Erie, PA arrived on UIWX 101 for UNH Durham via PC-CP-MEC-B&M.
3-71 47 used in filming movie “A Separate Peace” at Rockingham, Jct 3-6-71, returned to Rigby afterward.
3-71 Proposal for Conway Scenic Railroad posted in 470 RR Club newsletter.
8-71 Saturday 7-31-71 BM 1576 hauled three of Dwight Smith’s cars from Intervale to North Conway
where they were placed on the turntable and pushed into the roundhouse with a tractor.
8/9-71 Work sessions on 47 continue at Rigby.
4-72. RRE snow train to North Conway with two GP’s pulling eight cars. 47 had been previously been
moved to North Conway and was available for inspection. ( I’m missing a few issued and don’t
know the date it was moved.)
5-72. ICC grants approval to abandon Conway Branch from Mt. Whittier to Intervale effective 5-25-72.
7-72. NH Attorney General thwarting the abandonment by B&M of Cheshire and Conway Branches.
10-72 ICC again ok’s abandonment of Cheshire and Conway branches but B&M takes no action.
11-72 Saturday 10-21-72 ID-2 makes last run from Intervale with BM SW-9 1230 with seven cars owned
By 470 RR Club members: BAR snowplow 450, B&ML caboose 27, Four boxcars ( two ex-MEC,
Two ex-GT ) and ex-D&H combine 120. All except the plow were set off at North Conway. The plow
was hauled south to Wolfboro. Weeked work sessions continue at North Conway and I participated in
many of them albeit a high school student at the time.
12-72 Last run north of Mt. Whittier by ID-2 on Tuesday 10-31-72. Dover to Ossipee gravel train D-7/D-8
on duty at Dover 7:30 AM Sunday- Thursday. B&M accepting bids on the property to be opened
12-15-72.
1-73. B&M and Wolfboro RR hope to sign final papers12-19-72
2-73. Federal Court rules B&M must within 60 days negotiate with Conway Depot Company for Conway
Branch property within the Town of Conway. B&M argues that Conway Scenic isn’t a “continued
operation” in the meaning of ICC rules and should be able to offer the property to other real estate
speculators. B&M was in bankruptcy reorganization at the time and was trying to realize as much
profit as possible through the disposition of assets.
4-73. Federal Court orders B&M to negotiate in “good faith” with Conway Scenic sometime before 4-23-73.
6-73. B&M offers 194 miles of ROW to the State of New Hampshire, including that which they are in
negotiations with CSRR.
12-73 First Circuit Court of Appeals in Boston affirms earlier federal Court rulings- B&M ordered to sell to
Conway Scenic.
2-74 NH PUC schedules hearing in Concord 2-14-74 per CSRR startup- CSRR and B&M in final talks.
7-74. CSRR leases track from B&M pending consumption of sale aiming for 4th of July startup.
8-74. 47 fired up first time Friday evening 8-2-74
Service began Sunday 8-4-74
Ran until 10-20-74, resuming again 5-24-75.
1-70. Dover- Intervale local restored to former status: running north as DI-1 M-W-F, laying over at North
Conway and returning to Dover as ID-2 T-T-S, service beyond North Conway to Intervale only as
needed.
5-70. 470 RR Club members invited to participate in weekend work sessions on 47 (7470) in storage
At Rigby Yard in South Portland.
2-71. MEC-B&M interchange at Intervale handled it’s first load in over a year when hi-wide load boiler
from Erie, PA arrived on UIWX 101 for UNH Durham via PC-CP-MEC-B&M.
3-71 47 used in filming movie “A Separate Peace” at Rockingham, Jct 3-6-71, returned to Rigby afterward.
3-71 Proposal for Conway Scenic Railroad posted in 470 RR Club newsletter.
8-71 Saturday 7-31-71 BM 1576 hauled three of Dwight Smith’s cars from Intervale to North Conway
where they were placed on the turntable and pushed into the roundhouse with a tractor.
8/9-71 Work sessions on 47 continue at Rigby.
4-72. RRE snow train to North Conway with two GP’s pulling eight cars. 47 had been previously been
moved to North Conway and was available for inspection. ( I’m missing a few issued and don’t
know the date it was moved.)
5-72. ICC grants approval to abandon Conway Branch from Mt. Whittier to Intervale effective 5-25-72.
7-72. NH Attorney General thwarting the abandonment by B&M of Cheshire and Conway Branches.
10-72 ICC again ok’s abandonment of Cheshire and Conway branches but B&M takes no action.
11-72 Saturday 10-21-72 ID-2 makes last run from Intervale with BM SW-9 1230 with seven cars owned
By 470 RR Club members: BAR snowplow 450, B&ML caboose 27, Four boxcars ( two ex-MEC,
Two ex-GT ) and ex-D&H combine 120. All except the plow were set off at North Conway. The plow
was hauled south to Wolfboro. Weeked work sessions continue at North Conway and I participated in
many of them albeit a high school student at the time.
12-72 Last run north of Mt. Whittier by ID-2 on Tuesday 10-31-72. Dover to Ossipee gravel train D-7/D-8
on duty at Dover 7:30 AM Sunday- Thursday. B&M accepting bids on the property to be opened
12-15-72.
1-73. B&M and Wolfboro RR hope to sign final papers12-19-72
2-73. Federal Court rules B&M must within 60 days negotiate with Conway Depot Company for Conway
Branch property within the Town of Conway. B&M argues that Conway Scenic isn’t a “continued
operation” in the meaning of ICC rules and should be able to offer the property to other real estate
speculators. B&M was in bankruptcy reorganization at the time and was trying to realize as much
profit as possible through the disposition of assets.
4-73. Federal Court orders B&M to negotiate in “good faith” with Conway Scenic sometime before 4-23-73.
6-73. B&M offers 194 miles of ROW to the State of New Hampshire, including that which they are in
negotiations with CSRR.
12-73 First Circuit Court of Appeals in Boston affirms earlier federal Court rulings- B&M ordered to sell to
Conway Scenic.
2-74 NH PUC schedules hearing in Concord 2-14-74 per CSRR startup- CSRR and B&M in final talks.
7-74. CSRR leases track from B&M pending consumption of sale aiming for 4th of July startup.
8-74. 47 fired up first time Friday evening 8-2-74
Service began Sunday 8-4-74
Ran until 10-20-74, resuming again 5-24-75.
Greg S