Dose anyone know where an auto unloading yard is on the philly sub is? I passed it comeing home to MD from Philly a few days ago and passed the yard, however i do not have any location of the area i was in at that time (sorry!)
Railroad Forums
Moderator: bwparker1
frikentrainnerd wrote:Dose anyone know where an auto unloading yard is on the philly sub is? I passed it comeing home to MD from Philly a few days ago and passed the yard, however i do not have any location of the area i was in at that time (sorry!)That yard is located in Twin Oaks adjacent to I-95 in the area of the Rt. 322 interchange.
JimBoylan wrote:It's a relatively new transload facility in Chester, built new by the railroad, one siding at a time. I don't think that there was much there before, and the landscape and track elevation were changed about 1970 when the Delaware Expressway, I-95, was built.They actually built an extended passing siding alongside that transload facility since it is busy enough that the local switching it was blocking the main waaaaay too often.
glennk419 wrote:They actually built an extended passing siding alongside that transload facility within the last few years since it is busy enough that the local switching it was blocking the main waaaaay too often.JimBoylan wrote:It's a relatively new transload facility in Chester, built new by the railroad, one siding at a time. I don't think that there was much there before, and the landscape and track elevation were changed about 1970 when the Delaware Expressway, I-95, was built.
JimBoylan wrote:It's a relatively new transload facility in Chester, built new by the railroad, one siding at a time. I don't think that there was much there before, and the landscape and track elevation were changed about 1970 when the Delaware Expressway, I-95, was built.I looked all over Bing maps but i could not find what looked like an autocarrier yard or anything like that.
glennk419 wrote:Jim, Glenn, thanks. From satellite photos the siding goes all the way down to the auto unloading yard, 2-3 miles. I used to live right on the Trenton line tracks up in NJ and saw trains that were about 2 miles long I estimated, so I guess they need those long sidings. JSglennk419 wrote:They actually built an extended passing siding alongside that transload facility within the last few years since it is busy enough that the local switching it was blocking the main waaaaay too often.JimBoylan wrote:It's a relatively new transload facility in Chester, built new by the railroad, one siding at a time. I don't think that there was much there before, and the landscape and track elevation were changed about 1970 when the Delaware Expressway, I-95, was built.