Can someone fill me in as to what CSX is up to on the Alexandria Branch between Hyattsville MD and over Route 50 and the former Pennsy line into Benning. All the brush under the old telegraph line has been removed and it seems like new grade crossing signal footings are being intalled further back in each side of the track. There has been grading and grade stakes on the north leg of the tye at hyattsville. I have heard they have wanted to double track the entire line from Hyattsville to the to the old connection with the former Conrail )Pennsy) main south of Benning. I am frequently working down near the Millville Quarry (Aggregate Industries) stone yard but never get a chance to ask the CSX workmen there.
As busy as this line is I am sure CSX would like more capacity. Starting with the old Virginia tower at 4th & D, several obsticals to double tracking come to mind. The Virginia Ave tunnel, the overpasses over the Pennsy line and US 50, the MD 450 crossing in Bladensburg and on.
Thanks,
Trackbolt
As busy as this line is I am sure CSX would like more capacity. Starting with the old Virginia tower at 4th & D, several obsticals to double tracking come to mind. The Virginia Ave tunnel, the overpasses over the Pennsy line and US 50, the MD 450 crossing in Bladensburg and on.
Thanks,
Trackbolt
The only thing cooler than seeing an ABBA set of EMD F-7's is hearing and ABBA set of EMD F-7's.