 #1531169  by dieciduej
 
GP40MC1118 wrote: Wed Jan 15, 2020 11:28 pm 3rd Iron is along the retaining wall, the 4th Iron is next to the Orange Line
Thank you.
 #1531880  by Ed Canney
 
Work continued this week with two front end loaders removing and scooping up dirt, rock, old ties, etc. One long track still remains next to the "orange line" tracks to about the Cambridge St bridge.
 #1532243  by RenegadeMonster
 
Saw a rail train parked at the end of the old Saugus branch last night.

I'm assuming the rail is probably for the yard 21 leads.

I have seen no work as of yet to repair the compromised retaining wall. Are there any plans to fix this while they work on the track or are they leaving it as is for now?
 #1532301  by MBTA3247
 
I passed through Sullivan Square yesterday. There's a wooden form positioned against the retaining wall for pouring new concrete, though I couldn't tell you if they've already done the pour.
 #1533532  by Ed Canney
 
On my way home yesterday afternoon (2/11) a single track was being put down including a bumper at the very far end that use to lead into Yard 21.
 #1534283  by Ed Canney
 
Today on the way home from work the laying of a single track continues and is all the way up to about the middle of the Sullivan MBTA station. The track is being put down next to the fence along the Orange line. There was also trucks doing grading and leveling work on the other side of the new track.
 #1534481  by dieciduej
 
RenegadeMonster wrote: Thu Feb 20, 2020 1:13 pm It looks like they used concrete railroad ties. Can anyone confirmed?
I can confirm that they are concrete. Looks like they are recycled.

Maybe they use some 140 lb rail! :P
 #1534668  by Trinnau
 
The correct term is "re-laid" but yes they are concrete and they came out of the Lowell Line, which had a small segment of concrete ties in the area where GLX is rebuilding the line. They'll last a considerable amount of time in a yard track.
 #1534872  by dieciduej
 
A switch is now being installed at the northern end of the Yard 21 track. With a single track stub that would hold at least one locomotive for running around. If the Orange Line has a slow order going south I should be able to get a picture.
 #1535759  by Ed Canney
 
Track work continues in the north part. The switch is done and the 2nd track has been re-laid up to about the Mystic Ave bridge. No progress on the track next to the Orange line in the past week. Regarding the single track stub at the north end it is about 250 feet long and could hold three engines.
 #1540210  by dieciduej
 
I was out and about, with the proper PPE, and I got some pictures of the status of the Yard 21 lead from a SB Orange Line train.

Yard 21 Leads
Yard 21 Leads
Yard 21 A.jpg (694.66 KiB) Viewed 2160 times
Both tracks in place.

Yard 21 Leads
Yard 21 Leads
Yard 21 B.jpg (813.25 KiB) Viewed 2160 times
Incomplete 3rd track.
 #1540213  by dieciduej
 
At the north end of the of the Yard 21 leads:

Got any ballast?
Got any ballast?
Got Ballast.jpg (632.65 KiB) Viewed 2158 times

I need to be regulated!
I need to be regulated!
Regulator.jpg (695.55 KiB) Viewed 2158 times

I should be tamped down.
I should be tamped down.
Tamper.jpg (718.41 KiB) Viewed 2158 times
Luckily got a new Orange Line car coming and going so the windows weren't scratched up.