Metro OIG report is out and it reports further issues with the concrete sealant and problems with the ballast in the railyard. Recommendation - Metro should reject the phase 2 project takeover in current conditions.
Metro OIG is calling for complete replacement of defective concrete and the ballast.
https://twitter.com/amaxsmith/status/11 ... 0045115392
Metro OIG is calling for complete replacement of defective concrete and the ballast.
https://twitter.com/amaxsmith/status/11 ... 0045115392