JcPinCT wrote: ↑Fri Jul 19, 2019 7:30 pm
"Come check out the proposed design for the Windsor Rail Station upgrades! Join CT Dept. of Transportation on Thursday, July 25, 5:30- 7:30PM in the Ludlow Room at Windsor Town Hall for a public information meeting. There will be time for Q&A with the project team."
Interesting meeting tonight. Here's a link to the Windsor existing station upgrades that CTDOT is proposing to make in 2020.
https://onedrive.live.com/?cid=A7B7CC4A ... 38&o=OneUp
Project will go out to bid late 2019 for a Spring 2020 start date and late 2020 completion date. The cost is $5 million which includes some track work (not the Windsor/Windsor Locks/Enfield double tracking) necessary for a new Windsor station to be built at a later date.
The project to add back the second track in Windsor, Windsor Locks and Enfield will follow the Windsor station upgrades project but NOT include the CT River bridge. The CT River bridge will be addressed in a separate future project (date TBD) as the existing bridge's historical design does not allow it to accept a second track with enough clearance for two trains.