Train322
Posts: 67
Joined: Sat Dec 26, 2009 5:13 pm

Re: M8's and Shore Line East

Post by Train322 » Fri Mar 01, 2019 9:26 pm

Is it possible to run a two car (one set) M8 on SLE?
Did not know as Dutch mentioned, about how only one of the single cars can be run on any single train and wondered if M8's needed to be run with one or more pairs.

Also = how many M8 does Metro North/CDOT have?
Compare to how many combined M2,M4,M6 they had prior to the M8 introduction/

I know they run more trains as ridership has increased.


Also, is it possible to run M8's on SLE weekend service or perhaps middle of day?
I would think fuel costs for Diesel runs are higher than electric costs and electrics probably emit less pollution.
The other question is down time for maintenance. Is it better to run M8's more often and put slightly few miles on the Diesel?

njt/mnrrbuff
Posts: 3436
Joined: Thu Sep 30, 2004 9:33 pm

Re: M8's and Shore Line East

Post by njt/mnrrbuff » Fri Mar 01, 2019 10:23 pm

Train322, please refer to DutchRailnut's last post. Don't count on them running east of New Haven in revenue service anytime soon. They haven't been approved by Amtrak to operate east of New Haven.

While the P40s have lousy acceleration, even with a three or four car train, it's not like they are stopping every mile and a half. Many of the SLE stops are four to five miles a part from one another and with high level platforms at many of the depots, that helps a little with the dwell time. A four car SLE diesel train can keep up with its schedule.



MNR runs so many trains on the New Haven Line. On weekends, while more trains might run between Stamford and GCT, there are plenty of trains that run to New Haven. Most times of the day, there are trains that run between New Haven and Grand Central twice an hour. Several of the trains runs express to Stamford from 125th Street and then after Stamford, it turns into a local. Many of the train operates as an express from 125th St to Stamford with a few that stop in Greenwich and then it makes Darien, S. Norwalk, Westport, Fairfield, Fairfield Metro, Bridgeport, Stratford, Milford, W. Haven, and New Haven. Again, MNR needs as many of the M8s as possible. On the New Haven Line, the stops are close enough to each other that the line is meant for MUs.

daybeers
Posts: 278
Joined: Mon Oct 09, 2017 7:13 pm
Location: HFD

Re: M8's and Shore Line East

Post by daybeers » Sat Mar 02, 2019 12:38 am

Wow this is so incredibly annoying! I'll be calling my state reps about this. CTDOT knows the SLE has been utter poop for a while now, and this was going to be its saving grace. Those P40s are in terrible shape. The paint is chipping so badly that it looks like a house that hasn't been painted in 20 years, they're inefficient, and they use diesel. The world is dying, people, and we need to do all that we can to stop it. Every little bit helps.

XBNSFer
Posts: 117
Joined: Fri Aug 06, 2004 9:56 pm
Location: Bridgeport, CT

Re: M8's and Shore Line East

Post by XBNSFer » Mon Jul 08, 2019 8:26 am

Stop being ridiculous. The world is not dying.
GE, not EMD, makes the best locomotives now; has for over 20 years. Get over it.

kitn1mcc
Posts: 998
Joined: Wed Oct 11, 2006 11:09 pm
Location: Old Lyme CT
Contact:

Re: M8's and Shore Line East

Post by kitn1mcc » Mon Jul 08, 2019 7:18 pm

FYI the state knows
Ui Company Meter Services

njt/mnrrbuff
Posts: 3436
Joined: Thu Sep 30, 2004 9:33 pm

Re: M8's and Shore Line East

Post by njt/mnrrbuff » Tue Jul 09, 2019 8:28 pm

If Connecticut managed its money better, there would have been enough M8s ordered by now to cover Shore Line East service. Sadly, there are other priorities, especially fixing up the infrastructure of the New Haven Line. Those P40s aren't in the best shape. Brand new equipment needs to be ordered for Ctrail services.

DutchRailnut
Posts: 22205
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13
Contact:

Re: M8's and Shore Line East

Post by DutchRailnut » Tue Jul 09, 2019 8:40 pm

enough M-8's were bought for SLE , sad part is Amtrak won't ok them for service
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

Jeff Smith
Site Admin
Posts: 8484
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: M8's and Shore Line East

Post by Jeff Smith » Wed Jul 10, 2019 8:15 am

Were there though Jaap? They kept those three sets of 2’s around far longer than they wanted. The additional sets after the 9’s are done for LIRR will help. And then there’s Penn...
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator/Co-Owner

DutchRailnut
Posts: 22205
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13
Contact:

Re: M8's and Shore Line East

Post by DutchRailnut » Wed Jul 10, 2019 4:36 pm

the 14 cars bought for SLE are in service in MN pool, provided the numbers several times already.
From insiders I hear SLE might not see M-8's due to Amtrak not cooperating.

and of course Amtrak says CDOT is not funding upgrades to catenary and power fast enough.

with about 1/3 of M-8 lifespan gone and no progress on SLE debacle its slim they will ever see SLE service.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

daybeers
Posts: 278
Joined: Mon Oct 09, 2017 7:13 pm
Location: HFD

Re: M8's and Shore Line East

Post by daybeers » Sun Jul 14, 2019 2:03 am

XBNSFer wrote:
Mon Jul 08, 2019 8:26 am
Stop being ridiculous. The world is not dying.
haha yeah it is: climate change!

Jeff Smith
Site Admin
Posts: 8484
Joined: Tue Nov 07, 2006 9:28 am
Location: MP 67.2 Georgia Southern Railway

Re: M8's and Shore Line East

Post by Jeff Smith » Sun Jul 14, 2019 6:54 am

Just a gentle reminder, we're not climatechange.net, we're railroad.net. Let's move on.
Next stop, Willoughby
~Jeff Smith (fka "Sarge") :: RAILROAD.NET Site Administrator/Co-Owner

Backshophoss
Posts: 6205
Joined: Mon Mar 05, 2012 7:58 pm

Re: M8's and Shore Line East

Post by Backshophoss » Sun Jul 14, 2019 7:10 pm

The "singles" are trailers,at best,2pairs with the single between them,a 5 car set for SLE
Amtrak' complaint has been the M-8's ACSES gear,might be a moot point as the New Haven line's ACSES goes online. :wink:
The Land of Enchantment is not Flyover country!

Riverduckexpress
Posts: 52
Joined: Fri Jan 23, 2015 2:28 pm
Location: Brooklyn

Re: M8's and Shore Line East

Post by Riverduckexpress » Sun Jul 14, 2019 10:40 pm

Backshophoss wrote:
Sun Jul 14, 2019 7:10 pm
The "singles" are trailers,at best,2pairs with the single between them,a 5 car set for SLE
Amtrak' complaint has been the M-8's ACSES gear,might be a moot point as the New Haven line's ACSES goes online. :wink:
Is the ACSES system on the M8s not up to par with what Amtrak desires?
DutchRailnut wrote:
Wed Jul 10, 2019 4:36 pm
the 14 cars bought for SLE are in service in MN pool, provided the numbers several times already.
From insiders I hear SLE might not see M-8's due to Amtrak not cooperating.

and of course Amtrak says CDOT is not funding upgrades to catenary and power fast enough.

with about 1/3 of M-8 lifespan gone and no progress on SLE debacle its slim they will ever see SLE service.
I understand there are a few short segments between New Haven and New London that need electrifying, but other than that, what does Amtrak want? Is the existing power not sufficient to handle both Amtrak and SLE trains? Shouldn't using M8s on SLE be in Amtrak's best interest? They can charge ConnDOT for using power and replacing diesel trains with faster electric trains should better for Amtrak's operations, no?

DutchRailnut
Posts: 22205
Joined: Thu Mar 11, 2004 8:02 pm
Location: released from Stalag 13
Contact:

Re: M8's and Shore Line East

Post by DutchRailnut » Mon Jul 15, 2019 10:24 am

the ACSES system on M-8's need some serious updating including radio link and it means all cars need update as the 14 cars would not be captive to SLE service only.

as for power Amtrak besides having pay CDOT for wiring tracks other than main tracks, wants to have CDOT upgrade the power system between New Haven and New London.
If Conductors are in charge, why are they promoted to be Engineer???

Retired Triebfahrzeugführer. I am not a moderator.

daybeers
Posts: 278
Joined: Mon Oct 09, 2017 7:13 pm
Location: HFD

Re: M8's and Shore Line East

Post by daybeers » Tue Jul 16, 2019 1:22 am

And what's the status of those two things?