 #1419939  by joesbag
 
This is GREAT news! They can lift the Curriers to North Java portion out of the mud and possibly in the future have special excursions to N. Java again?
 #1448414  by thebigham
 
The A&A has been brushcutting from Curriers to North Java.

Track rehab will begin next year on this section.

They're really opened up the right of way. I'll take some pictures soon.
 #1474252  by BSOR Patarak
 
There was a small section of heavier rail installed north of Curriers. The reflecting pond received a new culvert and was drained considerably. Other culverts were replaced. A lot of ditching is being done on both sides to dry out bad sections. Nearly 2 out of 3 ties were changed out. Ballasting and tamping will commence in the next couple of weeks. A&A crews have been running freight evenings to accommodate the track work.
 #1476080  by thebigham
 
Pics taken Tuesday June 12, of the rehab between Curriers and North Java.

New ties are in. Ditching completed. Ballasting has begun with tamping to follow.

Pics of the "upper" Rt 98 crossing at Java Center.
Attachments:
100_4045.JPG
100_4045.JPG (676.19 KiB) Viewed 8367 times
100_4047.JPG
100_4047.JPG (596.25 KiB) Viewed 8367 times
100_4048.JPG
100_4048.JPG (525.05 KiB) Viewed 8367 times
 #1479153  by thebigham
 
#112 and #113 took 8 loads to North Java today (July 10) and will have 9 empties for their return train. The contractor for the rehab told me he had 6,000+ bolts to install and that work would be done in 3 weeks.

More rehab pics here:

http://photos.greatrails.net/show/?orde ... e=1&key=33" onclick="window.open(this.href);return false;