Railroad Forums 

  • Track issues in South Brooklyn

  • Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
Discussion related to NYAR operations on Long Island. Official web site can be found here: www.anacostia.com/nyar/nyar.html. Also includes discussion related to NYNJ Rail, the carfloat operation successor to New York Cross Harbor that connects with NYAR.
 #1368599  by jtunnel
 
Just before the Blizzard of 2016 it looks like the rail-head rolled over on the NY&A interchange track. Today was the first day crews could get into the area to remove some of the affected equipment and begin repairs. Some of the loaded cars are still partially on the ground.

http://jtunnel.rrpicturearchives.net/ar ... ?id=114295" onclick="window.open(this.href);return false;
 #1368638  by DogBert
 
I wonder if they'll have to shut down the N subway when they're re-railing? (since it comes out of the tunnel right next to those cars). I'm guessing it's no big deal with them being lumber cars...

Years ago LIRR dropped a tanker in Yard A and the powers that be suspended area subways, moves through harold, etc... at rush hour, of course.