However you bring up a good point, if these costumers are still around after the double tracking project some sort of crossover is going to have to be put in to be able to get back east to Pineaire. It will be interesting to see what they will do. I doubt they will want freights running all the way from Farmingdale to Deer Park on number one track. I'm sure an interlocked crossover will be added somewhere with the double track project between those two points.My guess will be JS will remain as an interlocking location. It will also give more flexibility to the dispatcher crossing over and running trains around.