I took the 544 local from Metuchen last night to NYP. First was surprised that train came on track 2 (about 10 mins late) so necessitated using lower level platforms. Any idea what is going on?? At first I thought it because of the new roadway tunnel at Evergreen Rd but we immediately switched back to track 1 just past Metuchen station. Metropark was at track 1.
The train never seemed to go faster than 20 mph the entire trip. It took 40 mins to get to Eliz and 1hr 10 to NYP. We were also stuck for 15mins between NWK and Sec for a bridge inspection. Anyone know what was going on.
To make matters worse, on the return last night - the 1157 from NYP, again we seemed to crawl. Almost an hour to Metuchen. Now I know only the south tunnel was open, but what is up with the other delays and slow running??
The train never seemed to go faster than 20 mph the entire trip. It took 40 mins to get to Eliz and 1hr 10 to NYP. We were also stuck for 15mins between NWK and Sec for a bridge inspection. Anyone know what was going on.
To make matters worse, on the return last night - the 1157 from NYP, again we seemed to crawl. Almost an hour to Metuchen. Now I know only the south tunnel was open, but what is up with the other delays and slow running??