CP Spring(was Amtrak/NH Spring tower) controls the access to Springfield Union Station from the Hartford line(Amtrak) and the
diamonds on the CSX(NYC/B&A) mainlines to the Pan Am/MassDOT(B&M) Conn River ML to Greenfield.
The Land of Enchantment is not Flyover country!

daybeers
Posts: 338
Joined: Mon Oct 09, 2017 7:13 pm
Location: HFD

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by daybeers »

Gotcha. Why would that affect track usage in Meriden and Berlin though?

User avatar
JcPinCT
Posts: 51
Joined: Fri Aug 07, 2015 9:17 am

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by JcPinCT »

daybeers wrote:
Sun Aug 11, 2019 10:18 am
Gotcha. Why would that affect track usage in Meriden and Berlin though?
It doesn't. There is separate track work being performed this weekend immediately south of the Berlin station to add back the switch that connects the south leg of the Pan Am wye to the main.

Traingeek3629
Posts: 172
Joined: Sun Feb 18, 2018 9:00 am

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by Traingeek3629 »

Any timeline for the Hartford station/viaduct replacement project? I know it times with the 84 project which won't be completed until at least 2040, but doesn't the viaduct come before the 84 project?

Furthermore, are there any design plans for the station?
TRAIN APPROACHING, PLEASE REMAIN BEHIND THE YELLOW LINE

Backshophoss
Posts: 6474
Joined: Mon Mar 05, 2012 7:58 pm

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by Backshophoss »

That is dependant on when I-84 rebuild starts,and what the plans are for it.
All of the RR plans are on hold!
The Land of Enchantment is not Flyover country!

User avatar
JcPinCT
Posts: 51
Joined: Fri Aug 07, 2015 9:17 am

Hartford Track Relocation Timeline and New Station Options

Post by JcPinCT »

Traingeek3629 wrote:
Thu Aug 22, 2019 10:25 am
Any timeline for the Hartford station/viaduct replacement project? I know it times with the 84 project which won't be completed until at least 2040, but doesn't the viaduct come before the 84 project?
I spoke to one of the CTDOT engineers during a public I84 meeting and he said if a below grade option (the current favored option) is selected as a design, moving the existing rail track and adding a second track would happen in the beginning of the construction phase in order to make room for the new road and allow commuters to use the Hartford Line during I84 rebuild.

As far as timing, the best option is to sign up for updates at the I84 project website (http://www.i84hartford.com/) and monitor the local Hartford news. As the I84 project schedule stands now, we're looking at 2030 as the earliest date for the new rail alignment.
Traingeek3629 wrote:
Thu Aug 22, 2019 10:25 am
Furthermore, are there any design plans for the station?
The March 2018 station options are the latest that I've seen.
https://www.courant.com/real-estate/pro ... story.html

"The options locate the train station just to the west of the new highway, which would be lowered in the reconstruction. But the options differ on the placement of a combined bus station and parking garage. One places it just to the west of the lowered highway, while the other locates it above the highway."

Backshophoss
Posts: 6474
Joined: Mon Mar 05, 2012 7:58 pm

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by Backshophoss »

The debates over the design and timeline continue to hold back the start of construction,as this will tear thru the heart of this city.
It seems to get close to a design pick,then backs away due to NIMBY reaction in the area
I 84 is a oversized scar in Hartford,that refuses to heal.
The Land of Enchantment is not Flyover country!

nomis
Posts: 2178
Joined: Fri Jan 02, 2009 1:52 pm
Location: MRS 20 (was QA 9 & QB 2)

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by nomis »

Mod Note: I am doing some housekeeping within this thread. I have split apart the original (before launch of service), and will make individual station threads to track the new infill stations, as well as an Hartford station (I-84 rebuild) relocation thread eventually.

There is a now sticky at the top of the forum for a list of current threads.
Moderator: Metro-North (with CDOT), Photography & Video

Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.

daybeers
Posts: 338
Joined: Mon Oct 09, 2017 7:13 pm
Location: HFD

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by daybeers »

Thanks for that, nomis!

I saw on another thread that Amtrak provides through ticketing for some services, such as NJ Transit's Atlantic City Line. See the attached screenshot.

Can Amtrak do this with the Hartford Line? Should be even easier as they own the line and run their own trains on it at the same prices, except for the slight difference in child fares (CTrail child fares are $1 but Amtrak is half off the adult fare).
You do not have the required permissions to view the files attached to this post.

nomis
Posts: 2178
Joined: Fri Jan 02, 2009 1:52 pm
Location: MRS 20 (was QA 9 & QB 2)

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by nomis »

The through ticketing on the ACL is a vestige of Amtrak service to Atlantic City. Amtrak rehabbed the line, and re-started passenger service solely under their name, then NJT had concurrent with Amtrak, then NJT took over all operations when Amtrak decided to dump the line.
Moderator: Metro-North (with CDOT), Photography & Video

Avatar: An overnight trip on Girard Ave. stumbles upon 6 PCC's and an LRV stuck within two blocks.

njt/mnrrbuff
Posts: 3611
Joined: Thu Sep 30, 2004 9:33 pm

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by njt/mnrrbuff »

Even when Amtrak was running on the ACRL, NJT trains were running at the same time and that line has been single track, even when both railroads were running. That's a similar setup to what the Springfield Line used to be.

hs3730
Posts: 179
Joined: Mon Dec 10, 2007 8:30 pm
Location: Albany NY

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by hs3730 »

Yesterday the Hartford Line had a Shore Line East set make one round trip between New Haven and Hartford, I was lucky enough to ride and get a video of it:
Mafersa at Berlin

Is this a common occurrence?

gregorygrice
Posts: 1148
Joined: Fri Jan 29, 2010 4:39 pm
Location: Queens, NY

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by gregorygrice »

hs3730 wrote:
Sun Sep 08, 2019 7:22 pm
Yesterday the Hartford Line had a Shore Line East set make one round trip between New Haven and Hartford, I was lucky enough to ride and get a video of it:
Mafersa at Berlin

Is this a common occurrence?
Yes. All CDOT equipment (Mafersa and MBB sets) are pooled and can run on either line.

hs3730
Posts: 179
Joined: Mon Dec 10, 2007 8:30 pm
Location: Albany NY

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by hs3730 »

gregorygrice wrote:
Sun Sep 08, 2019 7:40 pm
Yes. All CDOT equipment (Mafersa and MBB sets) are pooled and can run on either line.
Thanks. I feel sorry for SLE folk who get stuck with an MBB set... they are in desperate need of seat replacement, swapping them out for M2 seats would have been an improvement...

User avatar
BandA
Posts: 2925
Joined: Thu Oct 11, 2012 11:47 am

Re: Hartford Line CtDOT New Haven-Springfield - NHHS

Post by BandA »

Urethane seems to break down after only about 10 years. I assume Messerschmidt Brown Boveri used urethane foam in their seats. Those coaches are about 30 years old.