MNCR is starting the Catenary work between Stamford and South Norwalk , track 4 is first and has bridge plates erected at 3 intermediate stations, the work does involve a lot of new catenary structures.
At Pelham new Catenary structures are being erected for new CP215 interlocking, this has track 3 closed.
At CP217 the new Catenary structures look to be inplace and work on switches and overhead wire are to resume.
At Pelham new Catenary structures are being erected for new CP215 interlocking, this has track 3 closed.
At CP217 the new Catenary structures look to be inplace and work on switches and overhead wire are to resume.