Post by RenegadeMonster » Sun Aug 05, 2018 7:20 am

Thats very interesting. Also it explains those green line trains sitting in the woods in PA I always wondered about.

I'd be cool, but I would have no place to store a red line or orange line car :P

MBTA3247
Posts: 2747
Joined: Tue Jul 11, 2006 6:01 pm
Location: Milton

Re: New Orange and Red Line Car Acquisition Process

Post by MBTA3247 » Sun Aug 05, 2018 1:44 pm

I would've expected the scrap price for a subway car to be quite a bit higher than $800.
"The destination of this train is [BEEP BEEP]" -announcement on an Ashmont train.

RenegadeMonster
Posts: 578
Joined: Tue Mar 07, 2017 9:19 am

Re: New Orange and Red Line Car Acquisition Process

Post by RenegadeMonster » Sun Aug 05, 2018 3:39 pm

Same, but I bet the price is what the scrap company is willing to pay for them if they have to remove the cars from the T's site and transport them them selves to the scrap yard. Could also take into account of having to take some units aport on to transport.

troffey
Posts: 126
Joined: Sat Jan 21, 2017 8:36 pm

Re: New Orange and Red Line Car Acquisition Process

Post by troffey » Mon Aug 06, 2018 4:09 pm

Scrap steel is going for about $200/ton at a scarp yard...figure in the cost of transport or on-site scrapping and a deduction on the per/ton price for all the non-metal parts and you'd be looking at maybe $150/ton? What's the weight of a T subway car?

RenegadeMonster
Posts: 578
Joined: Tue Mar 07, 2017 9:19 am

Re: New Orange and Red Line Car Acquisition Process

Post by RenegadeMonster » Mon Aug 06, 2018 6:41 pm

The Boston Globe reported about 30 tons per subway car.

User avatar
BandA
Posts: 2891
Joined: Thu Oct 11, 2012 11:47 am

Re: New Orange and Red Line Car Acquisition Process

Post by BandA » Mon Aug 06, 2018 6:58 pm

just slip some rubber wheels over the steel ones & add a generator, apply some roofing tar & bondo & you'll be stylin'. Oh, and a steering wheel, lol. Nobody will mess with you going through the Big Dig in a modified Orange Line car!

blackcap
Posts: 133
Joined: Thu May 06, 2004 10:53 am
Location: Magna, UT (formerly of Gaston County, NC; Olathe, KS; and Woburn, MA)

Re: New Orange and Red Line Car Acquisition Process

Post by blackcap » Wed Aug 15, 2018 11:57 am

The Red Line mock-up car is on display at City Hall Plaza through Thursday:

https://www.universalhub.com/2018/new-r ... ders-slide

jwhite07
Posts: 1486
Joined: Thu Mar 11, 2004 7:39 pm

Re: New Orange and Red Line Car Acquisition Process

Post by jwhite07 » Thu Aug 30, 2018 5:07 am

Noticed a flatbed truck with a tarped new Orange Line car awaiting unloading behind Wellington Yard yesterday morning; per NETransit there are four expected. One pair of the cars already in testing was sitting on a yard lead south of the carhouse. Could not see where the second pair was.

Arlington
Posts: 4152
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: New Orange and Red Line Car Acquisition Process

Post by Arlington » Thu Aug 30, 2018 11:32 am

jwhite07 wrote:Noticed a flatbed truck with a tarped new Orange Line car awaiting unloading behind Wellington Yard yesterday morning; per NETransit there are four expected. One pair of the cars already in testing was sitting on a yard lead south of the carhouse. Could not see where the second pair was.
What do you/we guess: Are these the Chinese-assembled ones or the first that are final-assembled in Springfield?
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn

jwhite07
Posts: 1486
Joined: Thu Mar 11, 2004 7:39 pm

Re: New Orange and Red Line Car Acquisition Process

Post by jwhite07 » Thu Aug 30, 2018 1:31 pm

Arlington wrote:
jwhite07 wrote:Noticed a flatbed truck with a tarped new Orange Line car awaiting unloading behind Wellington Yard yesterday morning; per NETransit there are four expected. One pair of the cars already in testing was sitting on a yard lead south of the carhouse. Could not see where the second pair was.
What do you/we guess: Are these the Chinese-assembled ones or the first that are final-assembled in Springfield?
The CRRC MA website says first Springfield-produced cars expected to start rolling out in December, so I'm guessing these are imports.

MRY
Posts: 22
Joined: Fri Nov 28, 2014 7:23 am

Re: New Orange and Red Line Car Acquisition Process

Post by MRY » Thu Aug 30, 2018 4:18 pm

Does any of the tariff stuff going on now effect the importation of complete cars or parts thereof?

orange1234
Posts: 108
Joined: Fri Jun 25, 2004 4:01 pm

Re: New Orange and Red Line Car Acquisition Process

Post by orange1234 » Thu Aug 30, 2018 5:30 pm

MRY wrote:Does any of the tariff stuff going on now effect the importation of complete cars or parts thereof?
I'm not sure about the recently received pilot cars or the carbody shells, but a large majority of the subassemblies and components are actually products of non-Chinese companies and are manufactured in the US.

User avatar
BandA
Posts: 2891
Joined: Thu Oct 11, 2012 11:47 am

Re: New Orange and Red Line Car Acquisition Process

Post by BandA » Thu Aug 30, 2018 9:38 pm

I think there is sovereign risk, but probably for orders that are receiving feddybucks. This order is paid for by MA taxpayers.

R36 Combine Coach
Posts: 5487
Joined: Mon Jun 09, 2008 8:51 pm

Re: New Orange and Red Line Car Acquisition Process

Post by R36 Combine Coach » Tue Sep 04, 2018 2:11 am

BandA wrote:I think there is sovereign risk, but probably for orders that are receiving feddybucks. This order is paid for by MA taxpayers.
100% MassDOT funded, no FTA?
Since my friend continues to chain smoke nonstop, she is probably an Alco.

chrisf
Posts: 363
Joined: Sat Apr 24, 2004 9:35 pm

Re: New Orange and Red Line Car Acquisition Process

Post by chrisf » Tue Sep 04, 2018 6:11 am

R36 Combine Coach wrote: 100% MassDOT funded, no FTA?
Correct. This is apparently so that the MBTA could insist on them being "built" in Massachusetts.