BandA wrote:If they are not shipping the completed units by rail, it's a pretty short haul across the state, 2 1/2 hours or less probably (Mr Google says 1 1/2 hrs, but that seems optimistic).
Google time estimate is reasonable at speed limits, assuming no traffic jams.

dieciduej
Posts: 622
Joined: Tue May 09, 2006 9:37 am

Re: New Orange and Red Line Car Acquisition Process

Post by dieciduej »

I saw a two car set, out on the test track this afternoon, just north of Assembly. Two things I noticed was still the lack of car numbers on the body and it was an A-B set of cars. A full cab was on the south end of the consist and just hostler controls on north end. I was on a Wellington bound train so I was too close to the any pics.

JoeD
JoeD

Member of IEEE, BSRA, ERA, BERA, SPH&TS, SFRH&MS, RGM&HS, UPHS, NHRHTA, NE PRRT&HS and PRRT&HS

This message was sent from a DEC VT100!

RenegadeMonster
Posts: 597
Joined: Tue Mar 07, 2017 9:19 am

Re: New Orange and Red Line Car Acquisition Process

Post by RenegadeMonster »

Saw the two car test set parked on the bridge over the Mystic River tonight.

User avatar
StefanW
Posts: 545
Joined: Wed Aug 18, 2004 8:27 pm
Location: Lynn, MA / MP 11.53

Re: New Orange and Red Line Car Acquisition Process

Post by StefanW »

Orange test set was parked right at the Sullivan platform at 9:45 this morning. Wow those doors are huge.

https://www.icloud.com/sharedalbum/#B0wG7HOIlG1DAVH

IMG_0004.JPG
[/url]
You do not have the required permissions to view the files attached to this post.
The Blue Line is good for Lynn, and Lynn is good for the Blue Line.

My live MBTA real-time mapping apps:
https://sites.harvard.edu/~wuensch/T/subway-map.html
https://sites.harvard.edu/~wuensch/T/commuter-rail-map.html

User avatar
BandA
Posts: 2972
Joined: Thu Oct 11, 2012 11:47 am

Re: New Orange and Red Line Car Acquisition Process

Post by BandA »

Wow, the door sill looks to be several inches too high. Is that because the suspension is new or that the track is too high, or the suspension needs to be adjusted.

Arlington
Posts: 4165
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: New Orange and Red Line Car Acquisition Process

Post by Arlington »

RL platform height = 4'1"
OL platform height= 3'9"

These OLs look about 4" too high...consistent with being at RL height!
Last edited by CRail on Sat May 05, 2018 1:42 am, edited 1 time in total.
Reason: Unnecessary quote removed.
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn

jonnhrr
Posts: 1196
Joined: Sun May 30, 2004 5:58 pm
Location: Sabattus ME USA

Re: New Orange and Red Line Car Acquisition Process

Post by jonnhrr »

That will be an issue for ADA compliance, unless they fix that in the production cars.
Avatar Photo - P&W local from Gardner to Worcester at Morgan Rd., Hubbardston

aednichols
Posts: 5
Joined: Fri Dec 01, 2017 9:29 pm

Re: New Orange and Red Line Car Acquisition Process

Post by aednichols »

It could be they did not bother leveling the test track with the platform because it’s not necessary for testing or revenue use.

rethcir
Posts: 273
Joined: Fri Nov 30, 2007 9:51 am

Re: New Orange and Red Line Car Acquisition Process

Post by rethcir »

Perhaps the train has an extending ramp/platform lip thing? Unsure the exact nomenclature.

orange1234
Posts: 109
Joined: Fri Jun 25, 2004 4:01 pm

Re: New Orange and Red Line Car Acquisition Process

Post by orange1234 »

I saw the test set at Wellington today and the vehicle floors were level with the platform. The suspension could have been jacked up to test the platform gap fillers.

Arlington
Posts: 4165
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: New Orange and Red Line Car Acquisition Process

Post by Arlington »

You say the floor was level with the platform...how about the door threshold ;-)
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn

orange1234
Posts: 109
Joined: Fri Jun 25, 2004 4:01 pm

Re: New Orange and Red Line Car Acquisition Process

Post by orange1234 »

Yes. That was implied as the vehicle floors are in alignment with the door threshold.

User avatar
BandA
Posts: 2972
Joined: Thu Oct 11, 2012 11:47 am

Re: New Orange and Red Line Car Acquisition Process

Post by BandA »

If the ¨test track¨ is not used for revenue service then they probably didn´t level the track.

CRail
Posts: 2406
Joined: Tue May 18, 2004 8:27 am
Location: Eastie

Re: New Orange and Red Line Car Acquisition Process

Post by CRail »

Air bags can be inflated/deflated. Leveling valves adjust the air pressure in them as the weight of the car fluctuates. Railroad cars, subway cars, streetcars, and buses all do this. With modern equipment, it's probably possible to program the valves to maintain different levels. Chicago Transit Authority's 5000s adjust to match the platform height after the doors open, it's almost like a bus kneeling. I've always thought that was a really neat feature, perhaps these cars have it.
Moderator: Massachusetts Bay Transportation Authority
Avatar:3679A (since wrecked)/3623B (now in service as 3636B).

Arlington
Posts: 4165
Joined: Wed Jun 02, 2004 7:51 am
Location: Medford MA (was Arlington MA and Arlington VA)

Re: New Orange and Red Line Car Acquisition Process

Post by Arlington »

Somebody spotted the new OL train running at NS Northbound yesterday at 5pm. Is it being tested in revenue service?
"Trying to solve congestion by making roadways wider is like trying to solve obesity by buying bigger pants."--Charles Marohn