Yard 21 - Somerville

Discussion relating to commuter rail, light rail, and subway operations of the MBTA.

Moderators: CRail, sery2831

dieciduej
Posts: 618
Joined: Tue May 09, 2006 9:37 am

Re: Yard 21 - Somerville

Post by dieciduej » Sun Sep 29, 2019 6:14 pm

CRail wrote:
Sun Sep 29, 2019 2:26 pm
Mod Note: Merged with existing Yard 21 topic, thanks dieciduej for the link!
Ruh roh raggy!
JoeD

Member of IEEE, BSRA, ERA, BERA, SPH&TS, SFRH&MS, RGM&HS, UPHS, NHRHTA, NE PRRT&HS and PRRT&HS

This message was sent from a DEC VT100!

RenegadeMonster
Posts: 581
Joined: Tue Mar 07, 2017 9:19 am

Re: Yard 21 - Somerville

Post by RenegadeMonster » Fri Jan 03, 2020 2:39 pm

Work has been going on with the Yard 21 lead tracks.

Last month they cut all the brush and cleaned everything up.

Today I noticed that the removed the set of rails closest to the retaining wall.

Are they removing it for the sake of removing it? Do they need to remove them to to repair the retaining wall?

Or are they planning some thing else. Such as redoing this section of rail to make it usable again?

I wonder if the set of rails closest to the Orange line will be coming out soon as well.

bostontrainguy
Posts: 1637
Joined: Sun Oct 23, 2011 11:14 am

Re: Yard 21 - Somerville

Post by bostontrainguy » Sat Jan 04, 2020 10:51 am

Thanks. Please keep us informed. This is all very interesting.

I see they are building new housing right next to the Mystic Wharf Branch. Just what we need . . . more NIMBYS to block the reactivation whenever it might happen.

dieciduej
Posts: 618
Joined: Tue May 09, 2006 9:37 am

Re: Yard 21 - Somerville

Post by dieciduej » Sat Jan 04, 2020 5:34 pm

RenegadeMonster wrote:
Fri Jan 03, 2020 2:39 pm
Work has been going on with the Yard 21 lead tracks.

Last month they cut all the brush and cleaned everything up.

Today I noticed that the removed the set of rails closest to the retaining wall.
I took this picture from an Orange Line train this morning of the Yard 21 Lead track removal. They were using the trackage next to the OL for Hyrailers.

Yard 21 Lead.png
You do not have the required permissions to view the files attached to this post.
JoeD

Member of IEEE, BSRA, ERA, BERA, SPH&TS, SFRH&MS, RGM&HS, UPHS, NHRHTA, NE PRRT&HS and PRRT&HS

This message was sent from a DEC VT100!

GP40MC1118
Posts: 3677
Joined: Thu Mar 11, 2004 8:06 pm

Re: Yard 21 - Somerville

Post by GP40MC1118 » Sun Jan 05, 2020 12:33 pm

The Yard 21 leads - 3rd & 4th Irons are being rehabbed for service. There will be about a three engine length
stub at the Assembly Square end for an engine/engines to runaround their train.

D

ceo
Posts: 217
Joined: Fri Mar 12, 2004 9:28 am

Re: Yard 21 - Somerville

Post by ceo » Sun Jan 05, 2020 10:11 pm

Is this for the PAR freights that will now have to use the Yard 10 lead to get to the Eastern Route, because of the GLX?
Last edited by CRail on Mon Jan 06, 2020 12:49 am, edited 1 time in total.
Reason: Unnecessary quote removed. Do not use the "quote" button as a reply button.

GP40MC1118
Posts: 3677
Joined: Thu Mar 11, 2004 8:06 pm

Re: Yard 21 - Somerville

Post by GP40MC1118 » Mon Jan 06, 2020 11:13 am

Primarily for PAR to store cars or runaround trains in the FX area. They literally have no yard space
anymore since GLX took away Yard 8. There is space out to Everett now that CSX is out of there.
MBTA also uses these tracks to access the T-Pad which is inside the wye at FX.

D

MBTA3247
Posts: 2747
Joined: Tue Jul 11, 2006 6:01 pm
Location: Milton

Re: Yard 21 - Somerville

Post by MBTA3247 » Mon Jan 06, 2020 1:09 pm

"T-Pad"?
"The destination of this train is [BEEP BEEP]" -announcement on an Ashmont train.

neman2
Posts: 216
Joined: Sun Apr 01, 2012 4:16 pm

Re: Yard 21 - Somerville

Post by neman2 » Mon Jan 06, 2020 7:49 pm

MBTA3247 wrote:
Mon Jan 06, 2020 1:09 pm
"T-Pad"?
I believe he is referring to what the T calls tracks that have a section paved like a crossing so a hy-rail vehicle can drive on to the track and lower its hy-rail gear. They are necessary where there are not grade crossings within a reasonable distance. Usually called a truck pad.

GP40MC1118
Posts: 3677
Joined: Thu Mar 11, 2004 8:06 pm

Re: Yard 21 - Somerville

Post by GP40MC1118 » Mon Jan 06, 2020 9:02 pm

No, the T-Pad is the fenced in area inside the wye at FX. Top end is just off Innerbelt Road, its
the fenced-in area between the two legs of the wye.

D

newpylong
Posts: 4302
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Yard 21 - Somerville

Post by newpylong » Tue Jan 07, 2020 11:29 am

Both Yard 21 tracks are supposed to be rebuilt.

RenegadeMonster
Posts: 581
Joined: Tue Mar 07, 2017 9:19 am

Re: Yard 21 - Somerville

Post by RenegadeMonster » Mon Jan 13, 2020 1:37 pm

Both Yard 21 tracks have now been removed.

All ties form track 1 have now been removed as well.

What are they doing further down. Are they making a connection to the mainline heading towards North Station?

GP40MC1118
Posts: 3677
Joined: Thu Mar 11, 2004 8:06 pm

Re: Yard 21 - Somerville

Post by GP40MC1118 » Tue Jan 14, 2020 12:29 pm

There is no need to make a connection to North Station. A crossover known as the 645 has always
been in place within FX Interlocking that allows a westward move towards Tower A via Mainlines 1-3.

D

dieciduej
Posts: 618
Joined: Tue May 09, 2006 9:37 am

Re: Yard 21 - Somerville

Post by dieciduej » Tue Jan 14, 2020 4:51 pm

Here is a photo, I took on Sunday (1/12/20), of ROW where the Yard 21 leads were. Can someone clarify the track numbers, please.

Yard 21 Lead (No Rail).png
You do not have the required permissions to view the files attached to this post.
JoeD

Member of IEEE, BSRA, ERA, BERA, SPH&TS, SFRH&MS, RGM&HS, UPHS, NHRHTA, NE PRRT&HS and PRRT&HS

This message was sent from a DEC VT100!

GP40MC1118
Posts: 3677
Joined: Thu Mar 11, 2004 8:06 pm

Re: Yard 21 - Somerville

Post by GP40MC1118 » Wed Jan 15, 2020 11:28 pm

3rd Iron is along the retaining wall, the 4th Iron is next to the Orange Line

Return to “Massachusetts Bay Transportation Authority (MBTA)”