Reliable sources say that Tower A was closed/vacated Wednesday March 27th. The operator and bridge controls
were moved into a leased trailer mounted on staging (for river viability) on the same side of the Charles and tracks
as the tower is.
Tower A will probably be razed at some point this year as its too far gone to save/rehab. End of an era to say the least!
were moved into a leased trailer mounted on staging (for river viability) on the same side of the Charles and tracks
as the tower is.
Tower A will probably be razed at some point this year as its too far gone to save/rehab. End of an era to say the least!