Double Tracking Projects

Post by Commuterrail1050 »

One example of double tracking that is currently happening is on the Franklin line between Walpole and Norfolk. Anyone have an idea if they are going to try and make the entirety of the franklin line from past readville to Forge Park? Seems unlikely but you never know, anything can happen with the T.

Tom coughlin
Posts: 88
Joined: Sun Jul 18, 2004 8:13 am
Location: Stow, Massachusetts

Re: Double Tracking Projects

Post by Tom coughlin »

Double tracking the Franklin Branch has been talked about. However, all stations west of Norwood Central would need to be reconfigured.
Tom Coughlin
Stow, MA (and native of Walpole)

User avatar
Cosmo
Posts: 2348
Joined: Mon Mar 22, 2004 4:55 pm
Location: New London, CT

Re: Double Tracking Projects

Post by Cosmo »

With the DT South (RR "West") of Walpole, there's going to be less single track than double for most of the line.
So much so it seems likely they won't need to DT Walpole to Norwood.
I think they COULD DT Walpole itself, but there's the tunnel under Rt 1A just North of the station that would be a serious problem. I don't believe that was ever DT.
Next time I deliver to Windsor Gardens I'll look to see if I can spot where the single track starts South of Norwood.
"It belongs in a MUSEUM!"
-Indiana Jones

Tom coughlin
Posts: 88
Joined: Sun Jul 18, 2004 8:13 am
Location: Stow, Massachusetts

Re: Double Tracking Projects

Post by Tom coughlin »

I forgot about the tunnel in Walpole under RT. 1A. The tunnel was double track at one time but later changed to a gauntlet track as rolling stock got larger. The gauntlet was removed when the line was single tracked (late 1940’s?). A gauntlet could be installed again with signals protecting the gauntlet like in earlier times.

Old timers used to talk about the effort needed to operate the “Armstrong” home signal east of the tunnel that protected the gauntlet. The thought of the run of mechanical linkage from the interlocking tower to this signal always amazed me. The interlocking tower was located just west of the station.

Tom Coughlin
Stow, MA

Agent at Clicquot
Posts: 134
Joined: Tue Jun 22, 2004 7:56 pm
Location: A stone's through from Clicquot, MA

Re: Double Tracking Projects

Post by Agent at Clicquot »

The chapter in Rail Lines of Southern New England (Branchline Books) noted the Norfolk County RR was double tracked in 1882. When was second main taken up?

Interested readers could visit the mbta's website: https://www.mbta.com/projects/franklin- ... uble-track.

The webpage says Norwood Central > Walpole is saved for last, probably due to skewed, over grade bridge (Rte 1A).

Phase II will extend the new track from Norfolk to "Frank St." (short of the layover yard?).

* Cliq *

The EGE
Posts: 2620
Joined: Wed Feb 16, 2011 6:16 pm
Location: Waiting for the N Judah

Re: Double Tracking Projects

Post by The EGE »

The second main was taken up in 1940-41 according to the Walpole Union Station NRHP form.

User avatar
BandA
Posts: 2977
Joined: Thu Oct 11, 2012 11:47 am

Re: Double Tracking Projects

Post by BandA »

Has part of the ROW been sold off since 1940, necessitating new retaining walls?

Agent at Clicquot
Posts: 134
Joined: Tue Jun 22, 2004 7:56 pm
Location: A stone's through from Clicquot, MA

Re: Double Tracking Projects

Post by Agent at Clicquot »

Just east of the Seekonk St. grade crossing, the line crosses the outflow from Highland Lake. Some additional work was required to stabilize the under grade for the new track.

-- Clicq

charding
Posts: 159
Joined: Wed Dec 10, 2008 1:33 pm

Re: Double Tracking Projects

Post by charding »

...the double track in Walpole taken up in 1940-/41? I was born in 1939 and I remember the double track...I may have a great memory, but not great...I was thinking 1943-44...as Yogi would say, ‘deja vue all over again’...I bet the Foxboro experiment doesn't make it out of the current crisis and cutback in service...