Apparently, there were many things that Metro failed to fix during SafeTrack
Metro’s SafeTrack program fell short of bringing a critical stretch of the Orange, Blue and Silver lines into a state of good repair, despite an unprecedented 16-day shutdown in the summer of 2016 that closed a portion of the system to tens of thousands of daily commuters, the agency acknowledged in a new internal review of the year-long maintenance effort.
https://www.washingtonpost.com/news/dr- ... b153e278e9" onclick="window.open(this.href);return false;
Metro’s SafeTrack program fell short of bringing a critical stretch of the Orange, Blue and Silver lines into a state of good repair, despite an unprecedented 16-day shutdown in the summer of 2016 that closed a portion of the system to tens of thousands of daily commuters, the agency acknowledged in a new internal review of the year-long maintenance effort.
https://www.washingtonpost.com/news/dr- ... b153e278e9" onclick="window.open(this.href);return false;