Would it be feasible for metro to build a pocket track between court house and rosslyn, or is it too deep to safely build it out?
"YOLO"
Would it be feasible for metro to build a pocket track between court house and rosslyn, or is it too deep to safely build it out?
Yes,
The engineering would not be an issue. The issue would be the grade, as I recall the grade is something over 3% between Rosslyn and Court House. If the pocket track was single ended with the entrance only at the Court House end the grade would not be an issue.