VIA push pull trains?

Discussion of Canadian Passenger Rail Services such as AMT (Montreal), Go Transit (Toronto), VIA Rail, and other Canadian Railways and Transit

Moderator: Ken V

Post Reply
Amtrak7
Posts: 2190
Joined: Thu May 01, 2008 4:39 pm
Location: Long Island / Pittsburgh
Contact:

VIA push pull trains?

Post by Amtrak7 » Sat Sep 10, 2016 11:51 am

From the Q2 Financial Report:
In order to offer this more flexible schedule, we optimized our cycling by introducing Push-Pull consists using our new 50/50 cars. These consists, used primarily on the Toronto – Ottawa cycle, allow us to reallocate our fleet to offer more frequencies without needing additional equipment. Together, the new car configurations and schedule also give VIA Rail more flexibility for future scheduling improvements.
I wasn't aware of VIA having cab cars? What equipment are they using?

electricron
Posts: 4575
Joined: Tue Aug 25, 2009 8:35 pm

Re: VIA push pull trains?

Post by electricron » Sat Sep 10, 2016 2:33 pm

Which page of that 62 page pdf had the quoted passage? Which coach cars have the new 50/50 split?

User avatar
Ken V
Posts: 914
Joined: Thu Mar 11, 2004 10:14 pm
Location: Toronto, ON

Re: VIA push pull trains?

Post by Ken V » Sun Sep 11, 2016 10:13 pm

Amtrak7 wrote:I wasn't aware of VIA having cab cars? What equipment are they using?
VIA is using locomotives at both ends for the push-pull operations.
Ken V. Moderator: Most things Canadian.
Any time could be train time!

Amtrak7
Posts: 2190
Joined: Thu May 01, 2008 4:39 pm
Location: Long Island / Pittsburgh
Contact:

Re: VIA push pull trains?

Post by Amtrak7 » Sun Sep 11, 2016 10:45 pm

electricron wrote:Which page of that 62 page pdf had the quoted passage? Which coach cars have the new 50/50 split?
Page 11, and I'm not sure about the 50/50 split either.

NH2060
Posts: 1512
Joined: Thu Feb 25, 2010 4:44 pm

Re: VIA push pull trains?

Post by NH2060 » Mon Sep 12, 2016 7:42 pm

Sounds like combining two sets of equipment back to back so they can be easily split up to form other consists on other trains i.e. F40-LRC-LRC-LRC-LRC-LRC-HEP2-HEP2-HEP2-HEP2-HEP2-F40.

R36 Combine Coach
Posts: 5447
Joined: Mon Jun 09, 2008 8:51 pm

Re: VIA push pull trains?

Post by R36 Combine Coach » Wed Sep 21, 2016 8:12 pm

Amtrak7 wrote:I wasn't aware of VIA having cab cars? What equipment are they using?
If only LRC diesels could have been converted to NPCUs.
Since my friend continues to chain smoke nonstop, she is probably an Alco.

dowlingm
Posts: 1175
Joined: Mon Apr 16, 2012 12:42 pm
Location: Toronto, ON

Re: VIA push pull trains?

Post by dowlingm » Thu Sep 29, 2016 11:10 pm

I've often had the same thought re the LRC locomotives, although to my mind it would have been better to make them APCUs which would have relieved the P42s of the need to provide HEP. But it also needed VIA to get past the aversion to 50/50 running. hopefully this is just an interim step until we get Brightline type trainsets or similar!

Post Reply

Return to “Canadian Passenger Operations: AMT, Go Transit, VIA, etc.”