Came across this picture: http://www.nsdash9.com/rosters/2120.html
Are these units just test beds or does NS have a job in mind for them? Also why no cab? I understand they are remote control but without a cab does it mean the the engineer rides on the steps(?) platform(?) or do they walk along side of the unit?
Are these units just test beds or does NS have a job in mind for them? Also why no cab? I understand they are remote control but without a cab does it mean the the engineer rides on the steps(?) platform(?) or do they walk along side of the unit?