Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

Post Reply
Train60
Posts: 76
Joined: Wed Jul 05, 2017 6:31 pm
Location: New England

Re: Connecticut River Line (Pan Am)

Post by Train60 » Thu Sep 20, 2018 6:40 pm

Big tie project in the works for the Conn River Line.
https://www.commbuys.com/bso/external/b ... entUrl=bid

Why would it be necessary to surface, align and regulate the ballast along the entire line between Springfield and Greenfield again? Didn't a NS crew do that as recently as 2014?

RenegadeMonster
Posts: 519
Joined: Tue Mar 07, 2017 9:19 am

Re: Connecticut River Line (Pan Am)

Post by RenegadeMonster » Thu Sep 20, 2018 7:19 pm

Wonder if it has anything to do with double tracking?

Train60
Posts: 76
Joined: Wed Jul 05, 2017 6:31 pm
Location: New England

Re: Connecticut River Line (Pan Am)

Post by Train60 » Thu Sep 20, 2018 8:27 pm

RenegadeMonster wrote:Wonder if it has anything to do with double tracking?
No double tracking mentioned in the bid docs. Just some new CWR for the sidings in Springfield and Northampton.

BM6569
Posts: 1364
Joined: Wed Oct 27, 2004 12:19 pm
Location: Hebron, Maine
Contact:

Re: Connecticut River Line (Pan Am)

Post by BM6569 » Fri Sep 21, 2018 1:15 pm

from the docs

"The number of ties to be replaced per mile varies from approximately 500 to
approximately 1400, up to a total of 30,000."

"MassDOT will provide up to six ballast cars per day for the contractor’s use. The
contractor shall coordinate with Pan Am and MassDOT for the use of this equipment."

And it mentioned a siding extension at MP 36.45 in a question they were asked:

"If someone else is doing the grading for the siding extension at MP 36.45, how much time should
we plan on lapsing between the time we dismantle the 800’ of track and when we can come back
and start building the 1,600’ of new siding? Further, if someone else is preparing the subgrade
including a ballast pad, why do we need to be bothered with handling or transporting any spoils
for the grade of the 800’ of dismantled track if someone else is doing the grading work to prepare
it for new construction?"

newpylong
Posts: 4232
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Connecticut River Line (Pan Am)

Post by newpylong » Fri Sep 21, 2018 3:04 pm

Over 100 pages in an RFP just to replace ties. Gotta love it.

User avatar
BostonUrbEx
Posts: 3835
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Connecticut River Line (Pan Am)

Post by BostonUrbEx » Sat Sep 22, 2018 5:38 pm

I'm a little thrown off by the 36.45 for the siding. Is the Greenfield Controlled Siding being extended to or from 36.45? Because the CPR 36 switch is listed as being located at 36.10, unless that is incorrect. If it is correct and the siding is being extended to 36.45, that must be well clear of the other side of the tunnel, up near the Arch St under-grade bridge. Can the tunnel fit double track? I thought it was a bit tight.

Allouette
Posts: 212
Joined: Thu Nov 13, 2014 10:07 am
Location: Plainfield NH

Re: Connecticut River Line (Pan Am)

Post by Allouette » Sun Sep 23, 2018 8:01 am

It was double track in B&M days. After the River line was singled, the north end was at Silver St at 37.72.

jay.barnes
Posts: 60
Joined: Tue Apr 17, 2012 5:06 pm
Location: Easthampton, MA

Re: Connecticut River Line (Pan Am)

Post by jay.barnes » Mon Oct 15, 2018 7:48 am

Looks like the PAS/PVRR interchange in Holyoke is actively being worked on; namely, the PVRR bridge over the canal. Last I saw (about 10/11 or so), rail on the bridge was being removed.

Stp243
Posts: 43
Joined: Tue Dec 11, 2012 8:07 am
Location: Springfield, MA

Re: Connecticut River Line (Pan Am)

Post by Stp243 » Mon Oct 15, 2018 1:44 pm

jay.barnes wrote:Looks like the PAS/PVRR interchange in Holyoke is actively being worked on; namely, the PVRR bridge over the canal. Last I saw (about 10/11 or so), rail on the bridge was being removed.
As of 8am this morning there was one section of deck completely removed from the span and crews were on site.

BM6569
Posts: 1364
Joined: Wed Oct 27, 2004 12:19 pm
Location: Hebron, Maine
Contact:

Re: Connecticut River Line (Pan Am)

Post by BM6569 » Tue Oct 16, 2018 8:57 am

Thanks for the update. Single track span, right?

Stp243
Posts: 43
Joined: Tue Dec 11, 2012 8:07 am
Location: Springfield, MA

Re: Connecticut River Line (Pan Am)

Post by Stp243 » Tue Oct 16, 2018 6:12 pm

Yes it's single track. It's single track from the remains of the Holyoke yard, down Water St all the way to under 391 where it joins the track to Westfield. I noticed a few boxcars up at the Sullivan loading site next to the water treatment facility. Nice to see some different rolling stock other than the usual scrap metal gons.

Edit: I'm going to post updates in the PVRR thread over in the New England forum. I'm in Holyoke everyday so I'll keep an eye on the progress.

jay.barnes
Posts: 60
Joined: Tue Apr 17, 2012 5:06 pm
Location: Easthampton, MA

Re: Connecticut River Line (Pan Am)

Post by jay.barnes » Fri Oct 19, 2018 12:43 pm

Update on the PAS/PVRR interchange bridge in Holyoke- deck is completely gone, and 1.5'-2' high concrete blocks have been installed on the tops of all three supports in the canal

User avatar
BostonUrbEx
Posts: 3835
Joined: Thu Dec 03, 2009 9:55 pm
Location: Winn to MPT 8, Boston to MPN 38, and Hat to Bank

Re: Connecticut River Line (Pan Am)

Post by BostonUrbEx » Sun Oct 21, 2018 1:39 am

Amazing the investment being put into this interchange. Frankly I don't expect it will even be used much. It'll probably just be pointed to in order to negotiate better rates from CSX.

newpylong
Posts: 4232
Joined: Thu Jun 28, 2007 12:32 pm
Location: NH

Re: Connecticut River Line (Pan Am)

Post by newpylong » Sun Oct 21, 2018 6:12 am

It was used heavily and climbing prior to being embargoed (again). EDPL would drop 8-12 cars for them every trip south.

Stp243
Posts: 43
Joined: Tue Dec 11, 2012 8:07 am
Location: Springfield, MA

Re: Connecticut River Line (Pan Am)

Post by Stp243 » Sun Oct 21, 2018 7:21 am

Sullivan scrap has operations that are served by both Pan Am (near the Amtrak station) and by the PVRR in the south side down near the water treatment plant. I imagine this work will provide Sullivan with some flexibility for shipping. Too bad a lot of the other local customers in Holyoke have dried up over the past years.