  • Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.
Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

 #1400804  by pnolette
 
KSmitty wrote:Irving track machines were swapping ties out in Winn today.

Pretty cool, there is now effectively trackwork from the Willows to 'Keag all running concurrently.
Sounds like they got plans for that part of the line..Gotta be the most trackwork we've seen going on this railroad in years.
 #1400873  by CPF363
 
See the "MAINE REGIONAL RAILWAYS PROJECT" page 9 using the link below:

http://maine.gov/mdot/tigergrants/docs/ ... rative.pdf" onclick="window.open(this.href);return false;

Work under TIGER is Northern Maine Junction to Waterville (MP 65 to MP 113). Surprising the decision was made to close the line in the first place putting the connection between the old MEC and EMRY at the mercy of the CMQ. The line needs a lot of work; track structure is a mix of 85, 100 and 112lb rail. The 85lb is shot and will have to be replaced with something heavier someday for reliable service at Class II speed over the entire run from Bangor to Keag. A lot of new ties, tamping and surfacing with new fresh stone would be good beginning to resumption of daily train service over the entire route if that is the railroad's intention.
 #1400975  by gokeefe
 
CN9634 wrote:Zero scope of work from the regional railways project includes work on Pan Am east of NMJ.... this is all them.
Thanks for the reminder. I was wondering if some of the ties delivered might be for another location but I had also forgotten that there was no trackwork on Pan Am north of Bangor.
 #1401223  by johnpbarlow
 
As of Friday 9/16/16, there's evidence of new ties (both installed and to be installed) on tracks 1 and 2 at Wagon Wheel Ayer, although it looks like some finishing work is needed on a couple of the ties installed on track 1. :wink:
Attachments:
Arrived 28N and ties to be installed at Wagon Wheel
Arrived 28N and ties to be installed at Wagon Wheel
PAS new ties at Wagon Wheel Ayer 091616 2.jpg (217.35 KiB) Viewed 2388 times
New ties installed on track 2 at Wagon Wheel
New ties installed on track 2 at Wagon Wheel
PAS New ties installed Trk 2 Wagon Wheel Ayer 091616.jpg (178.56 KiB) Viewed 2388 times
New Track 1 tie installation without spikes/tie plate at Wagon Wheel
New Track 1 tie installation without spikes/tie plate at Wagon Wheel
PAS New ties installed Trk 1 Wagon Wheel Ayer 091616.jpg (209.83 KiB) Viewed 2390 times
 #1401582  by gokeefe
 
Tamper working in Winthrop today directly by Main Street crossing. Up close and direct observation showed tamping activity with a minimal amount of additional ballast. Not sure if this might be in preparation for a larger rock drop. That answer made sense ...
 #1401587  by KSmitty
 
You drop your rock, then tamp and surface, not the other way around.

The issue in Winthrop isnt a lack of rock, its the crossing and likely some poor surfacing. And adding rock only exacerbates the crossing issue, because you raise the track around, but not in the crossing, which creates a low spot, which enforces a slow order.
 #1401590  by gokeefe
 
KSmitty wrote:You drop your rock, then tamp and surface, not the other way around.
Well that's certainly what I thought. It looked as if they were doing a very light addition of new rock. This was just before the switch south of Main Street.
 #1402032  by fromway
 
Posting on CMQ site for NMR lends a bit of irony to the work being done in the Keag area. The posting talks about the Port of St. John expanding container service for serve the Northeast. Maybe all the work will pay off with more business, both to CMQ and PAN AM.
 #1402061  by johnpbarlow
 
I eyeballed the stretch of Stony Brook in Westford, MA between Town farm Rd crossing and CPF-309 on Friday 9/23/16 and Pan Am has replaced every second or third tie. CWR looks pretty good there, as well, but the ballast could stand to be cleaned and built up.
Attachments:
PAR track Westford 092316.jpg
PAR track Westford 092316.jpg (250.8 KiB) Viewed 1912 times