  • Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.
Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

 #1517967  by PBMcGinnis
 
Nope. Switch at Very Fine siding still disconnected.
The bureaucracy that is MBTA and associated vendors continues to plod along.

And the daylight move FI-1 took down the Fitchburg Line and into Boston that way last week was a one time event to help out the scrap yard in Everett while keeping crew qualifications up to date.
 #1543408  by rmccown
 
There's work going on at the Veryfine/Patriot Beverage siding. All the old rail and ties are taken up, and it looks like they've rough-graded for the length extension.

I cant tell if there's work going on around Middlesex Corporation, but it looks like they've put in some new jersey barriers and barrels in some of the parking lot, so that may be related.
 #1543492  by bostontrainguy
 
rmccown wrote: Thu May 21, 2020 10:59 am There's work going on at the Veryfine/Patriot Beverage siding. All the old rail and ties are taken up, and it looks like they've rough-graded for the length extension.

I cant tell if there's work going on around Middlesex Corporation, but it looks like they've put in some new jersey barriers and barrels in some of the parking lot, so that may be related.
There is an earlier post saying the Middlesex project is dead.
 #1543874  by PBMcGinnis
 
That is correct. Middlesex Paving siding is dead. It was predicated on them winning the contract to supply stone for the Green Line Extension project.

It will be interesting to see how fast the work gets done at Patriot Beverage. They have been waiting for a year to get the OK from Keolis or MBTA.
At some point Pan Am will have to start qualifying crews. FI-1 made some trips via the Fitchburg Route this winter in order to bring some heavier scrap metal cars to Everett. Those cars are now cleared to go via one of the jobs out of Lawrence at night.
Patriot Beverage currently transloads their plastic pellets at Fitchburg Yard.
 #1578630  by highrail
 
There were cars on that siding today. First time in the area and saw the old Littleton Station...not bad considering all the "stuff" all over the place. I wonder who owns it...

Steve


Image
 #1597259  by Lincoln78
 
I've driven 2A between Littleton and Ayer a few times in the past six weeks. There have been around six hoppers at Patriot Beverages. Regret not paying close enough attention to determine if they have changed out.
 #1604046  by BostonUrbEx
 
I'm guessing Patriot Beverage is a PAR customer, being east of CPF WL? PAR would serve it out of Ayer, which is PAS, out of convenience. So how does this all work out post-CSX? Is B&E territory going to be extended down to Tenney? Or will it still be a CSX customer?
 #1604050  by Ken Rice
 
The line between PAS and CSX (formerly PAR) is on the Stony Brook line just east of the milling and the San Vel auto facility. Which is in turn just east of the Willows. But Patriot Beverage (formerly Very Fine) is on the line to Boston, not the Stony Brook line. Unless I’m very mistaken its PAS, like the other Ayer area industries.
 #1604065  by newpylong
 
Yes, PAS trackage rights extend all the way out to Littleton over the MBTA. The only conceivable CSX long shot customers in the area would be if whoever owns Nortons down in Worcester decided to use rail again. Or the warehouse in Clinton that is marketed as having a dock but hasn't seen rail that I know of.