  • Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.
Guilford Rail System changed its name to Pan Am Railways in 2006. Discussion relating to the current operations of the Boston & Maine, the Maine Central, and the Springfield Terminal railroads (as well as the Delaware & Hudson while it was under Guilford control until 1988). Official site can be found here: PANAMRAILWAYS.COM.

Moderator: MEC407

 #1425349  by F-line to Dudley via Park
 
eustis22 wrote:so the adverse thing filing.....does this mean that PAR is going to reactivate service?
They're trying to take the conveyor belt biz from Milford & Bennington. The adverse discontinuance filing is limited to only the 5 miles between Law Stone and Granite State, and not the unused outer 15 miles to Monadnock Paper Mill at end-of-track. So if they succeed MBRX would lose all current business, but technically still have rights to serve Monadnock. But Monadnock immediately becomes moot because their revenues would be zeroed out and they (1) would immediately fold before ever being able to make a phone call to the mill, (2) can't recover costs on that 15-mile run to serve very small carloads on the mill to ever live by that alone. So any which way MBRX goes immediately out of business.

Double-whammy to Billerica's spite game. A fallen flag, and NHDOT is left with little choice but to (not immediately, but inevitably) abandon all track beyond the quarry when it's unable to RFP for a new carrier, because PAR won't touch anything beyond the quarry.


As for the conveyor belt...nutty if they plan to run it as-is because it's 2 trips per day between quarry and plant. As if Billerica didn't already waste enough on taxi fare from slop ops they're now going to have to burn fares 5 days a week on a Nashua crew to handle this. And power rotation will be iffy since they can barely complete their own NA-1 job to Wilton without canning on the return trip to Nashua. I suppose if Law & GS invested in more siding storage and better loading machinery so their carloads could be more efficiently crammed into a single round trip that would do away with the need for the twice-a-day conveyor belt and allow for a vanilla NA-1 daily job to tack it on at the end. It's the only scenario that would make PAR appropriate enough profit margins for this spite move against MBRX to make a lick of business sense. But that assumes somebody's going to pay for the customer storage expansion, and that somebody is going to staff-up NA-1 well enough to run it on-time without need to outlaw most days on the trip back to Nashua.
 #1425379  by mbrxnh1
 
As president of the MBRX, I have been asked to comment on the number of recent posts concerning the MBRX and a PAR filing which seeks an adverse discontinuance. First, PAR has not filed an application for an adverse discontinuance against the MBRX. PAR has filed a "petition for waiver" with the STB and in their filing indicated they intend to file an application to seek an adverse discontinuance on or about April 20, 2017 against the MBRX. The MBRX will be responding to the petition for waiver shortly. Should PAR file an application for an adverse discontinuance, the MBRX, Granite State Concrete and others will vehemently oppose such a PAR filing. The petition for waiver only includes the PAR trackage from MP 16.36 in Wilton to MP 11.00 in Milford. The MBRX operates from MP 13.4 (Granite State Concrete in Milford - PAR section) to MP 18.68 (Granite State Concrete's Wilton quarry - MBRX section). Although rarely used, the trackage from MP 18.68 to MP 30.10 is maintained to FRA Class 1. The trackage beyond MP 30.10 is presently out of service. The active trackage between MP 16.36 to MP 18.86 (state owned) is maintained to an FRA Class 3 condition.

The MBRX will continue to meet our obligations and has NO interest in curtailing our service to Granite State Concrete or the State of New Hampshire.
 #1425400  by BostonUrbEx
 
mbrxnh1 wrote:The active trackage between MP 16.36 to MP 18.86 (state owned) is maintained to an FRA Class 3 condition.
Wow, meanwhile the entire Hillsboro Branch (PAR) is excepted track.
 #1425576  by BM6569
 
Besides the freight main the DE runs on, best track in the state!
 #1425752  by b&m 1566
 
Isn't the SLR Class 3 and the Portland Division Class 4?
 #1427291  by newpylong
 
That doesn't mean anything. Most of PAS is CWR and it's only class 2.

So.e of the SLR is Class 3 and always has been, but no Class 4 like most of the Portland Division.
 #1429035  by b&m 1566
 
Is 503 still sitting in Milford today?
 #1432551  by johnpbarlow
 
Monadnock Paper has submitted a letter to the STB in opposition to Pan Am Railways' Petition for Waiver seeking adverse discontinuance of the Milford-Bennington Railroad's operations. Interesting excerpt:
Over the years, we have spent hundreds of thousands of dollars maintaining the track to our Mill. That did not prevent Pan Am from discontinuing service many years ago. If we are ever to have
any chance of regaining service, it will only be if the Milford-Bennington Railroad is operating the line.
https://www.stb.gov/filings/all.nsf/ba7 ... 243313.pdf

Also, the Town of Wilton has weighed in at the STB indicating it doesn't favor the waiver:
https://www.stb.gov/filings/all.nsf/ba7 ... 243381.pdf

I'm guessing the track condition between Wilton and Bennington isn't very good having not been used for several years?
 #1432580  by newpylong
 
Not that I support giving the M&B the boot, but it's a odd filing by the Mill. If they were interested in using rail they would have done so by now.
 #1432631  by b&m 1566
 
I'm confused: I wasn't aware the B&M abandoned operations first, I though the abandonment came after the mill stopped using rail service.
 #1432651  by Dick H
 
If NS takes over PAR, they would probably attempt to sell the PAR portion of the line
to the state or a short line operator. The PAR portion needs considerable track work.
The state would work get some TIGER grant money for repairs, that is, until
yesterday. The anti-rail and everything else Sheriff in DC has proposed ending all
TIGER grants.