 #1430123  by [email protected]
 
Is it possible to route CSX River Line trains to North Jersey Terminals using a reconstructed Newburgh Shortcut Track, which currently is mapped as abandoned between the (active) Newburgh Industrial Track and North of the Metro north PJ Line at Woodbury.

Please see the attached map and can you let me know if there are variables that we should know for such a plan?

Thanks!
Attachments:
River Line Relief Routing Long Term Plan.jpg
River Line Relief Routing Long Term Plan.jpg (1.06 MiB) Viewed 5124 times
 #1430130  by [email protected]
 
mackdave wrote:The Newburgh Shortcut right of way crosses the NY Thruway at grade, and is now a pipeline ROW. Two big disadvantages.

Mackdave

I believe there is still a tunnel (need to clarify) and a pipeline? Which?

Some of us are thinking of a new track using the Thruway r/o/w (east side). Does that make more sense?
 #1430592  by rr503
 
The biggest obstacle you're gonna run into is NJT. They're not gonna want freights on the MBCL, and CSX isn't gonna want to schedule around commuter runs. That's why they so vehemently oppose any efforts to put commuters onto the river sub.
 #1430942  by TrainDetainer
 
Beside what rr503 said about NJT (permanent deal breaker without adding 2 additional tracks from Jersey to tie-in point) and the pipeline (which can be negated with cubic dollars), it took all of two minutes on google maps to confirm that neither the Shortcut underpass south of Mountainville or the Newburgh Branch underpass at Vails Gate Junction still exist. By asking about the east side of the thruway, are you asking about building on the east side further south of the Mountainville underpass to go under the thruway closer to Newburgh Junction? Most of the Shortcut was on the east side to begin with. Seems like any reconstruction of the Shortcut would be difficult given the ROW is partly public roads now and developement of Central Valley would prohibit a tie-ie at Newburgh Jct - you'd have to tie in just north of Central Valley. Also, CSX is currently in the process of double-tracking most of the River Line, so any rerouting would have to accommodate double track for freight, so add a few more baskets of cash.

Other problem with the Shortline is it uses the Newburgh Branch to get to the River Line in Newburgh, which involves sharp curves on 4 miles of grade that's mostly over 1.1%, well over anything else on the River Line. Not an improvement for freight trains. It might be OK for commuter trains if you were looking to get passenger service to Newburgh, but CSX probably would laugh at you.

Rerouting the River Line traffic doesn't seem like a happening project to me with the poor tie-in at Newburgh and the $2B-$3B price tag (at least 70 miles of new double track, 20-25 miles of ROW acquisition and the cost of totally renegotiating/disrupting the RRs and governments involved).