Railroad Forums 

  • CMQ SLR Detour Trains

  • Discussion of present-day CM&Q operations, as well as discussion of predecessors Montreal, Maine & Atlantic Railway (MMA) and Bangor & Aroostook Railroad (BAR).
Discussion of present-day CM&Q operations, as well as discussion of predecessors Montreal, Maine & Atlantic Railway (MMA) and Bangor & Aroostook Railroad (BAR).

Moderator: MEC407

 #1459331  by fogg1703
 
Curious if a CMQ crew or a pilot is required for the detoured SLR trains over CMQ territory? How does SLR compensate CMQ, per car?
 #1459343  by 690
 
CMQ and CP crews are being used when the trains operate over those respective railroads, to answer your first question.
 #1459586  by fogg1703
 
Thanks 690. Given that this appears to be a long term issue with the bridge being out, I wonder if CMQ will need to hire additional crews or adjust the timing of Trains 1 and 2 so as the two round trips/day can be accommodated with existing crews.
Last edited by MEC407 on Sat Feb 03, 2018 10:31 am, edited 1 time in total. Reason: unnecessary quoting
 #1460829  by trainiac
 
In theory they could, but it would be extremely inconvenient locally. People around Sherbrooke want the bridge rebuilt.
Last edited by MEC407 on Fri Feb 09, 2018 1:38 pm, edited 1 time in total. Reason: unnecessary quoting
 #1461007  by MEC407
 
The Saint-François River bridge in Brompton.

More info in the SLR/SLQ forum: http://www.railroad.net/forums/viewtopic.php?f=192&t=59429&start=1335#p1456869