Railroad Forums 

  • PTC by 2015

  • General discussion about railroad operations, related facilities, maps, and other resources.
General discussion about railroad operations, related facilities, maps, and other resources.

Moderator: Robert Paniagua

 #630332  by atsf sp
 
According to Railway Age January 2009, the FRA is mandating that all Commuter/Freight lines and Toxic inhalation hazard routes need to be upgraded to Positive Train Control by 2015 because of the Metrolink accident. The Los Angeles area needs this system in place by 2012. Does PTC require engines upgraded or tracks?
 #630498  by DutchRailnut
 
Both, the tracks need the equipment installed and all locomotives used as lead locomotive on that territory , including cabcars etc need to be equipped with proper equipment.