According to Railway Age January 2009, the FRA is mandating that all Commuter/Freight lines and Toxic inhalation hazard routes need to be upgraded to Positive Train Control by 2015 because of the Metrolink accident. The Los Angeles area needs this system in place by 2012. Does PTC require engines upgraded or tracks?