2926 is back on the rails,Hutcher helped move it west of the drop pit,is stranded there untill repair to the track are done,as well as upgraded steel needed
to replace what was bent in the pit,this will require concrete removal/replacement,just east of the pit.
Hutcher's bill was paid,but nore $$$$ needed to repair track and the pit.
The Tender has been disconnected for now due to the minor derailment of 2926's trailing truck.
To meet PTC requirements, the trailing Diesel will be used(per July'18 Trains mag story on pg 60 of that issue.)
The Land of Enchantment is not Flyover country!