Railroad Forums 

  • Search

  • Search it up!

Search found 7349 matches

 Return to the advanced search

 by F-line to Dudley via Park ¦  Sun May 15, 2005 2:23 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Slow Red Line ¦  Replies: 9 ¦  Views: 2124

I've noticed other Red Line slow zones which have appeared in the last two weeks or so: -NB between Porter and Davis -NB leaving South Station -Sometimes stopping for a minute or more before entering a station, though the headways have been generous enough. Seen this at Fields Corner and Park Stree...

 by F-line to Dudley via Park ¦  Sun May 15, 2005 2:09 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Official Trackless Trolley Thread/Tracker ¦  Replies: 532 ¦  Views: 120476

I see they're starting construction on a new apartment high-rise in the weedy old parking lot attached to the North Cambridge TT yard. "Trolley Park" I think they're calling the new complex. The construction might be interesting to watch from a transit remnant standpoint. There are lots of...

 by F-line to Dudley via Park ¦  Sun May 15, 2005 9:56 am ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Top priorities for new MBTA GM ¦  Replies: 52 ¦  Views: 6735

What a load of crap the "it's too expensive" argument is becoming. How about some real numbers for the "proposed alternatives" people are ranting about. I guarentee they will at least as expensive if not more expensive than Phase III is. But amazing how the figures are never inc...

 by F-line to Dudley via Park ¦  Sun May 15, 2005 12:06 am ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: News on Green Line to Somerville ¦  Replies: 103 ¦  Views: 20153

Running the proposed line along the current Lowell commuter rail corridor may pose problems for Medford. That portion of the city is already dealing with parking issues around the current West Medford commuter rail stop, where a street-level crossing currently ties up traffic on Route 60. Nonreside...

 by F-line to Dudley via Park ¦  Sat May 14, 2005 11:22 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Top priorities for new MBTA GM ¦  Replies: 52 ¦  Views: 6735

What a load of crap the "it's too expensive" argument is becoming. How about some real numbers for the "proposed alternatives" people are ranting about. I guarentee they will at least as expensive if not more expensive than Phase III is. But amazing how the figures are never inc...

 by F-line to Dudley via Park ¦  Sun Apr 17, 2005 8:47 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Orange Line subway (Silver Line replacement) ¦  Replies: 2 ¦  Views: 943

That would be way too expensive. Real replacement service only needs to go as far as Dudley Square to adequately serve the commuters affected by the closing of the El. The former stations beyond that point--Egleston, Green St., and Forest Hills--are close enough to the Southwest Corridor and a resto...

 by F-line to Dudley via Park ¦  Sun Apr 17, 2005 5:28 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Central Artery Question. ¦  Replies: 2 ¦  Views: 754

Some of the slurry walls that were poured to supported the weight of the old elevated Artery during construction go deep enough to be recycled as tunnel walls on sections of the proposed N-S link ROW. The rail link was part of the original design decades ago, but in order to secure federal funding f...

 by F-line to Dudley via Park ¦  Mon Apr 11, 2005 8:34 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Green Line incline construction at Science Park ¦  Replies: 9 ¦  Views: 1908

Have they done any work on Science Park station or the Viaduct as part of the construction? ADA raised platforms? An elevator? Upgrading the track so Type 8's can finally ride out to Lechmere on a regular basis? A new coat of paint? Better lighting? Patching the crumbling concrete on parts of the Vi...

 by F-line to Dudley via Park ¦  Tue Mar 22, 2005 9:21 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Mattapan Ashmont High Speed Line Shutting Down ¦  Replies: 13 ¦  Views: 2173

I believe the primary impediment to using newer trolleys on the line is power load more than anything else. The line draws power off the Red Line, and would require its own power station to operate multiple Boeings or T7's at once (and obviously T7's would require upgrades to pantograph overhead). S...

 by F-line to Dudley via Park ¦  Mon Mar 14, 2005 7:33 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Mulhern to retire this summer ¦  Replies: 10 ¦  Views: 1540

Didn't the Federal GAO(General Accounting Office) give Romney and the rest of his "BRT Mafia" the finger some time back, by placing Phase Three of the Silver Lie on the "Not Recommended" list for funding, IIRC?? Where's Das Mitt goona come up with the cash then , if the feds cut...

 by F-line to Dudley via Park ¦  Fri Mar 11, 2005 8:28 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Another escalator accident on Red Line ? ¦  Replies: 17 ¦  Views: 3287

Don't know if this is a coincidence or not, but the escalator at Porter that killed that kid has been out-of-service ever since this week's incident happened at Harvard. They haven't even been taking it apart or anything...it's just stopped and blocked off with the yellow repair barricades (usually ...

 by F-line to Dudley via Park ¦  Fri Mar 11, 2005 8:07 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Mulhern to retire this summer ¦  Replies: 10 ¦  Views: 1540

From the aforementioned link to the Romney transit plan article: "Those T expansion projects include $756 million for the third phase of the Silver Line bus service" Too bad so much of the limited transit funding will be wasted on a new bus tunnel running from South Station to Boylston. T...

 by F-line to Dudley via Park ¦  Fri Mar 11, 2005 7:53 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Animated ads in Red Line tunnels ¦  Replies: 92 ¦  Views: 16101

MAYDAY... MAYDAY... TOPIC ALERT! Is the sign lit again yet? Ill be there tonight so i can check it out. Yeah, what was this topic again? Wait, I'm the one that started it drifting...ooops... :wink: The Harvard sign is still out. Not lit, but still in place, and judging by the color, looks like the ...

 by F-line to Dudley via Park ¦  Fri Mar 11, 2005 7:37 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: The New Longer-Lasting Axe Effect ¦  Replies: 12 ¦  Views: 2337

Moving back to topic, what you saw in Harvard Square is called "station domination". I've seen several different companies do this, in several different stations. It can be annoyingly unsubtle. I rode a Red Line car this PM that was "dominated" by said Axe ads. So the Harvard ad...

  • 1
  • 486
  • 487
  • 488
  • 489
  • 490