Re: Southcoast Rail

 by MBTA F40PH-2C 1050 ¦  Mon Mar 11, 2024 5:01 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Southcoast Rail ¦  Replies: 1272 ¦  Views: 341778

Test trains or the mock runs have started on phase 1 according to the Mbta.com website. Just got updated today. haven't heard a peep yet about test trains. I'll ask tomorrow. Don't believe everything you read on that site, a lot is just "for show." Check the Mass Coastal forums to see if ...

Re: Commuter Rail Delay/Cancellation Thread

 by MBTA F40PH-2C 1050 ¦  Mon Mar 11, 2024 4:55 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Commuter Rail Delay/Cancellation Thread ¦  Replies: 58 ¦  Views: 8669

still under investigation. Train #1708 was informed to inspect the catenary at 30 mph trk 3 Eastbound....came upon low hanging wire, and ripped it down, only Track 2 could get by after some small "repairs". Wires were initially across all tracks. Occurred on the curve just west of Ruggles ...

Re: F40PH-3C overhaul program

 by MBTA F40PH-2C 1050 ¦  Mon Mar 11, 2024 4:49 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: F40PH-3C overhaul program ¦  Replies: 1014 ¦  Views: 209514

1033 sent to BET on the Readville Switcher on Sunday the 10th. The #3 motor needs to be changed out and is having air issues, along with computer issues - ACSES. The joke of the rebuilds continues

Re: F40PH-3C overhaul program

 by MBTA F40PH-2C 1050 ¦  Wed Mar 06, 2024 4:46 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: F40PH-3C overhaul program ¦  Replies: 1014 ¦  Views: 209514

The 1033 failed its ACSES STOP signal test today....try again tomorrow

Re: F40PH-3C overhaul program

 by MBTA F40PH-2C 1050 ¦  Sun Feb 11, 2024 7:24 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: F40PH-3C overhaul program ¦  Replies: 1014 ¦  Views: 209514

1033 confirmed in Framingham 2/11....***should*** be on CSX L005 tonight to Attleboro for transfer to Middleboro and then to Rochester for set up, then testing on the Corridor

Re: Fairmount Line Discussion

 by MBTA F40PH-2C 1050 ¦  Sun Feb 11, 2024 7:16 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Fairmount Line Discussion ¦  Replies: 486 ¦  Views: 172363

Keolis pays Amtrak to let us store equipment in SHSY and the Front yard (no OCS)... its theirs, and they are not fans of us storing in their yard...$$$ pays. Tracks 1 2 and 4, HOLDEN to HEBRONVILLE are electrified Track 3 is not.

Re: Remaining Kawasaki Cars South

 by MBTA F40PH-2C 1050 ¦  Sun Feb 11, 2024 7:06 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Remaining Kawasaki Cars South ¦  Replies: 49 ¦  Views: 4871

guy....clearly you don't know what you're talking about. Who gives a sh** about windows? It is not the windows that are drafty with the 2nd gen....the draft comes in from the control stand and brake stand when the CC crew door is closed. That is why most of us ride with the CC door open and side cre...

Re: Fairmount Line Discussion

 by MBTA F40PH-2C 1050 ¦  Wed Feb 07, 2024 5:36 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Fairmount Line Discussion ¦  Replies: 486 ¦  Views: 172363

anything the T touches, gets F'ed....How is Natick Center coming along? 4 year later and barely the Elevator shaft built. Worcester will be completed and operational soon. Boston Landing was built in 4 days with the private investment. When Amtrak put up the wires, you can see where they planned for...

Re: Southcoast Rail

 by MBTA F40PH-2C 1050 ¦  Wed Feb 07, 2024 5:30 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Southcoast Rail ¦  Replies: 1272 ¦  Views: 341778

not in our life time

Re: Remaining Kawasaki Cars South

 by MBTA F40PH-2C 1050 ¦  Wed Feb 07, 2024 5:27 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Remaining Kawasaki Cars South ¦  Replies: 49 ¦  Views: 4871

guys guys guys calm down here, this is getting out of control. The fleet doesn't matter to the company, Keolis...Your understand they are a private operation, for profit operation......these coach numbers mean NOTHING to them, nor who built them. They only look at passenger #'s that can ride and bat...

Re: Southcoast Rail

 by MBTA F40PH-2C 1050 ¦  Sat Feb 03, 2024 10:24 am ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Southcoast Rail ¦  Replies: 1272 ¦  Views: 341778

So the whole construction & updates to the line is an MBTA project, not a Keolis project, I assume since it is huge. Once they are done then they turn it over to Keolis to operate. Correct. It is a MBTA project, Middlesex Corp is doing the physical construction and once completed with PTC, Cabs...

Re: Remaining Kawasaki Cars South

 by MBTA F40PH-2C 1050 ¦  Sat Feb 03, 2024 10:20 am ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Remaining Kawasaki Cars South ¦  Replies: 49 ¦  Views: 4871

not sure what the obsession is with Kawasaki CCs SS, but as of 2/2: SS 1705, 1709, 1711, 1715 The equipment cycles have no rhyme or reason. The K cars are not getting "removed" from SS, all depends on the rotation of equipment, what gets picked for what. We have not "lost" all 9*...

Re: MBTA's Max Speed?

 by MBTA F40PH-2C 1050 ¦  Tue Jan 16, 2024 4:45 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: MBTA's Max Speed? ¦  Replies: 26 ¦  Views: 3465

all respect Mr CRail, but the HSP's MAS is 103 mph I appreciate the respect, but your very own timetable disagrees with you. HSP-46 speeds Lite, Multiple Lite, and With train are 50, 50, and 90 respectively. I have deduced that this is why ACSES displays 90 in the cab on the corridor when MAS for M...

Re: GP40-MC Overhaul

 by MBTA F40PH-2C 1050 ¦  Tue Jan 16, 2024 4:43 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: GP40-MC Overhaul ¦  Replies: 136 ¦  Views: 30502

computers my friend, glitches. Works one day, not the next. If it doesn't pass its initial test, its considered failed until repaired or tested again. The 1138 was supped to be the loco for the RDC move last week to Billerica, but failed its test

Re: Rotem Cars Discussion (new bi-level cars)

 by MBTA F40PH-2C 1050 ¦  Tue Jan 16, 2024 4:34 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Rotem Cars Discussion (new bi-level cars) ¦  Replies: 2224 ¦  Views: 576360

What is traction interlock? Traction Interlock deals with the door circuit system, connected to applicable coaches that are equipped. TI has nothing to do with the brake system. If an exterior door is not completely closed, tractive effort is severed and engineer can not take power. It has been bro...