The 2023 annual report states: On the rail operations side, the delivery of 25 new dual-powered ALP-45 locomotives continues and the first of the Multilevel III vehicles, consisting of 58 power cars and 55 coaches to replace the 40-year-old Arrow III fleet, is expected to arrive in spring 2024. It i...