Re: LIRR Mainline Third Track Project

 by UN Block ¦  Fri Dec 10, 2021 9:42 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

And, though Denton was supposed to be closed to traffic this past Monday, as of Wednesday it hadn't, though the new detour signs are all posted around the neighborhood.

Re: LIRR Mainline Third Track Project

 by UN Block ¦  Fri Nov 26, 2021 8:42 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

I believe all the new platforms are at the LIRR's "standard" width of only eight feet. Compare this with Metro-North's "standard" of ten feet wide.

I hear tale told that the LIRR and M-N are BOTH under the MTA!

:-)

Re: LIRR Mainline Third Track Project

 by UN Block ¦  Sun Nov 07, 2021 10:40 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

The third track was laid through Carle Place station before they built the temporary platform on top of it. Same at NHP and Merillon Ave.

Re: Mainline SIgnal Bridge Number? MP25-26 c.1960

 by UN Block ¦  Wed Oct 27, 2021 10:45 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Mainline SIgnal Bridge Number? MP25-26 c.1960 ¦  Replies: 3 ¦  Views: 648

Nope. It was a home signal, not an automatic block signal.

Re: Milepost. The clarification and discussion

 by UN Block ¦  Wed Oct 27, 2021 9:45 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Milepost. The clarification and discussion ¦  Replies: 20 ¦  Views: 3272

You're quite correct here. The centerline of Montauk station is at stationing 6076+30, which is MP 115.08. The stationing numbers that are used for engineering purposes don't change over time, even with right of way realignments! What they do is create "match marks" where two different sta...

Re: Mainline SIgnal Bridge Number? MP25-26 c.1960

 by UN Block ¦  Wed Oct 27, 2021 9:38 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Mainline SIgnal Bridge Number? MP25-26 c.1960 ¦  Replies: 3 ¦  Views: 648

1. Home signal 1
2. That dwarf signal was 3 but it and the wye track were removed sometime in 1960, I don't know the exact date. It looks like that dwarf signal goes back to the beginning! My 1912 plan has it!

Re: Milepost. The clarification and discussion

 by UN Block ¦  Sat Oct 23, 2021 11:17 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Milepost. The clarification and discussion ¦  Replies: 20 ¦  Views: 3272

I'm not sure exactly when the "Old Southern Road" was renamed Atlantic and Springfield to Montauk. My earliest ETT is May 1921 and the deed was already done by then.

Re: Milepost. The clarification and discussion

 by UN Block ¦  Tue Oct 12, 2021 11:44 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: Milepost. The clarification and discussion ¦  Replies: 20 ¦  Views: 3272

Well, they COULD rename the Atlantic Branch to Montauk Branch from Hall to Springfield Junction and Montauk Branch to Springfield Branch. That would clean up the milepost "issue" for the Montauk Branch from Valley east. I never understood why the employee timetables going back 100 years di...

Re: LIRR Mainline Third Track Project

 by UN Block ¦  Sat Sep 04, 2021 2:27 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

Technically, the pedestrian crossing between Mineola station and Main St is still in service. It is officially wing removed from service next week.

Re: LIRR Mainline Third Track Project

 by UN Block ¦  Wed Aug 11, 2021 6:28 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

Yes, Nassau is still with us. Not sure if the abatement work is done yet. Last I heard was “September.”

Re: LIRR Mainline Third Track Project

 by UN Block ¦  Sun Aug 08, 2021 4:39 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

The last pic is of Willis Ave, not Main St. Main St will not cross the tracks.

Re: LIRR Mainline Third Track Project

 by UN Block ¦  Fri Jul 16, 2021 4:23 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

I’m guessing that the Main St pedestrian crossing is NOT permanently out of service as the gates are still functioning. When Main St closed to vehicular traffic, the crossing apparatus were deactivated that weekend.

Re: LIRR Mainline Third Track Project

 by UN Block ¦  Fri Jul 16, 2021 4:19 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Mainline Third Track Project ¦  Replies: 1245 ¦  Views: 287238

The Hicksville Secondary Track does have its third rail installed now. I’m sure it’s not energized yet as there hasn’t been a General Notice to that effect yet.

Re: LIRR Switch/Signal Indications

 by UN Block ¦  Thu Jun 04, 2020 1:18 pm ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: LIRR Switch/Signal Indications ¦  Replies: 36 ¦  Views: 8751

Hate to be the bringer of sad news but, Floral Park to Hicksville is going to be RAS signaling.

Re: M3 Retirement, Scrapping

 by UN Block ¦  Wed Oct 23, 2019 7:39 am ¦  Forum: Long Island Rail Road (LIRR) ¦  Topic: M3 Retirement, Scrapping ¦  Replies: 163 ¦  Views: 74443

Yes, I saw this also. Anybody know EXACTLY which of the 88(?) M3s are getting PTC retrofits?