Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Tue Aug 09, 2022 9:44 am ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

The train goes to the Leominster yard and then changes end. There are 2 industries in Leominster, a trash trans load and a plastic manufacture. The are around 18 to 25 cars in the train, the bulk are construction trash the there some times 2 to 6 empty cars from Clinton that are hauled to Leominster...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Sun Mar 21, 2021 1:57 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

The two old sidings were the ones that are in the mud and the weeds.

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Sun Mar 21, 2021 1:54 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

F74265A, Just after my last post, last Thursday CSX removed the switch and the remaining track that went to the siding up to the property line / gate to the industry. The runaround track at the Leominster yard is in good shape this was re-done along with the rest of the work last year, there are sti...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Mon Mar 15, 2021 7:55 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

Just a reminder there is still a siding about 100 yards towards Leominster from the new siding for the trash transload. The switch is still in place but the track thru the grade crossing at Linchfield Street was removed when the branch redone last year eliminating one track in the grade crossing. It...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Fri May 22, 2020 5:36 am ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

Some times I don't get their logic, the local ran out of time and yesterday in Leominster yard then they sent a light engine yesterday in the pm to bring the train back to Framingham. Does it cost less to send a light engine out here than it would to cab a crew out? This same thing took place around...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Wed May 20, 2020 6:10 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

The local "B724" just went by my place in Leominster heading down town at 7:05 they must have stuffed the track gang in the unused siding just east of the east end of Prat Junction Rd. That is was where they work working this afternoon. The last grade crossing before the Leominster yard ha...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Tue May 19, 2020 5:07 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

Production track gang started work Monday 5/18 Leominster yard and are working towards Framingham, they are doing approx 24 miles this season. Replacing every 3 to 4 ties and more if needed. one of the workers stated even with all this work the branch may still be limited to 10mph. Grade crossings a...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Mon May 04, 2020 5:16 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

The new C&D customer looks like it is shipping 10 to 12 cars every other day, they are now doing drop offs and pick ups on Sunday.

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Thu Apr 23, 2020 2:47 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

They are doing prep-work for a tie job the have dropped new ties all the way to the Leominster yard, don't know were they are starting but the ties go all the way thru Leominister

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Thu Apr 09, 2020 5:25 pm ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

Loaded trash train just left Leominster, did not get a chance to count the cars.

Re: Hoosac Tunnel Discussion & News

 by arcadia terminal ¦  Fri Mar 06, 2020 5:57 pm ¦  Forum: Pan Am Southern (PAS) / Berkshire Eastern Railroad ¦  Topic: Hoosac Tunnel Discussion & News ¦  Replies: 384 ¦  Views: 73797

Just an update yesterday when at work there was a eastbound autorack train going thru west Fitchburg my office overlooks the line.

Peter

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Tue Dec 17, 2019 8:42 am ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

John, The three track yard is behind the building parallel to the branch there is also a track that enters the back of the building along left wall for loading cars. The switch off of the branch is a trailing point so the yard will have to be worked from the west end and then the cars pulled up to L...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Tue Dec 10, 2019 8:12 am ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

Just before last weeks snow CSX cut in the switch at the industry in Leominster, all the new track is surfaced in the indusrty.

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Mon Nov 18, 2019 8:54 am ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

I checked the new industry in Leominster this week end. They have 3 new yard tracks down and track that is going into the new building location, most of the track is down but not surfaced yet. They have yet to cut in the switch, from the branch to the new tracks but there is a pre-fab switch compone...

Re: CSX Fitchburg Secondary Discussion

 by arcadia terminal ¦  Tue Oct 01, 2019 7:18 am ¦  Forum: CSX Transportation including Pan Am ¦  Topic: CSX Fitchburg Secondary Discussion ¦  Replies: 311 ¦  Views: 101495

Quick math the new indusrty will process 1,000 tons a day and using 100 ton cars that's 10 cars a day 70 cars a week if they run 24/7 that is one big uptick on the line.
That is if all the product goes out by rail, I would think the plastics would go out by truck for reprocessing.