Railroad Forums 

  • Search

  • Search it up!

Search found 4581 matches

 Return to the advanced search

Re: Rail Restoration to Newport, RI

 by BandA ¦  Mon Apr 15, 2024 12:46 pm ¦  Forum: New England Railfan ¦  Topic: Rail Restoration to Newport, RI ¦  Replies: 1 ¦  Views: 277

$50M or so for a railroad bridge to an island with a 60,000 population is a big ask, plus 5 miles of track in rough shape, plus track that was "temporarily removed". Connecting to South Coast Rail which in itself has indirect routing to Boston. I think maritime law needs to be revised to i...

Re: Kawasaki Rebuild Program at Alstom

 by BandA ¦  Mon Apr 15, 2024 12:02 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Kawasaki Rebuild Program at Alstom ¦  Replies: 324 ¦  Views: 140409

Why would they not rebuild the Kawasakis? I rode on some recently and they still look good and ride good, although they have not kept up with the wifi and power outlet race!

Re: Southcoast Rail

 by BandA ¦  Mon Apr 08, 2024 9:55 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Southcoast Rail ¦  Replies: 1289 ¦  Views: 344651

The phase II route does exist, it has just OOS?? or landbanked?? since the 1970s. Runs from Stoughton through North Easton to Taunton. The consent decree between the state of Massachusetts and the Army Corp of Engineers, which is ridiculous, makes the former main line uneconomical to restore.

Re: "Up North" Gawking (District 1 sightings)

 by BandA ¦  Sun Apr 07, 2024 1:08 am ¦  Forum: Pan Am Railways (formerly Guilford Rail System) ¦  Topic: "Up North" Gawking (District 1 sightings) ¦  Replies: 2609 ¦  Views: 536761

Its not so bad that they are clearcutting the forest for expanded rail yard, but they will be spraying roundup or other defoliants next to the river for years to come. Imagine the economics of a rail yard in northern maine vs say beacon park or even west springfield.

Re: B&M Eastern Route Quad Tracking & Harbor Tunnel

 by BandA ¦  Sat Apr 06, 2024 12:40 am ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: B&M Eastern Route Quad Tracking & Harbor Tunnel ¦  Replies: 15 ¦  Views: 1487

The B&A completed their grade separation, station replacement construction, purchase of the Highland Branch & connection with their main line, purchase of the Grand Junction, balked on requirement to grade separate the Grand Junction. They did in fact electrify their short Lower Falls Branch...

Re: Commuter Rail Electrification

 by BandA ¦  Thu Apr 04, 2024 7:48 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Commuter Rail Electrification ¦  Replies: 440 ¦  Views: 80804

ARTICLE: "Goodbye diesel, hello electric. Battery-powered, improved service could be coming to MBTA’s commuter rail in 2027." Link: https://www.bostonglobe.com/2024/03/24/metro/battery-powered-improved-service-could-be-coming-to-ts-commuter-rail-in-2027/[ At least we know that Keolis want...

Re: #4 Red Line Cars 1900-2151

 by BandA ¦  Sat Mar 30, 2024 9:13 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: #4 Red Line Cars 1900-2151 ¦  Replies: 132 ¦  Views: 26788

I guess it makes sense to keep it under control of a communist-socialist government agency.

Re: #4 Red Line Cars 1900-2151

 by BandA ¦  Sat Mar 30, 2024 12:26 am ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: #4 Red Line Cars 1900-2151 ¦  Replies: 132 ¦  Views: 26788

Why would the MBTA want the Springfield factory? It's just going to close after the orders are completed. Would it be a convenient location for a layover yard for Springfield Commuter Trains? Is it even connected by rail?

Re: Ex-Dedham Branch sold, to be built over

 by BandA ¦  Sat Mar 30, 2024 12:05 am ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Ex-Dedham Branch sold, to be built over ¦  Replies: 6 ¦  Views: 983

I believe there was also Newton Loop service, one way on the Highland Branch, the other way on the B&A Main Line (now called the Framingham/Worcester Line)

Re: Fairmount Line Discussion

 by BandA ¦  Sun Mar 17, 2024 5:07 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Fairmount Line Discussion ¦  Replies: 486 ¦  Views: 172868

Contract Duration The term of the contract is from contract execution until June 30, 2026. The contracted vendor will initiate the project and ensure that it can be transitioned to another vendor at any date following June 30, 2026, with such transition to be conducted at the MBTA’s discretion Does...

Re: Cocoa Station

 by BandA ¦  Sun Mar 17, 2024 1:00 pm ¦  Forum: Brightline Trains LLC (formerly All Aboard Florida and Virgin) ¦  Topic: Cocoa Station ¦  Replies: 4 ¦  Views: 597

So Brightline is getting $20M subsidy for a Cocoa station and $45M for a Stuart station? Wow.

I hope the Cocoa station isn't a plain vanilla design :-D

Potential for a Commuter Rail Workers Strike

 by BandA ¦  Sun Mar 17, 2024 12:23 pm ¦  Forum: Massachusetts Bay Transportation Authority (MBTA) ¦  Topic: Potential for a Commuter Rail Workers Strike ¦  Replies: 13 ¦  Views: 1442

https://www.wbur.org/news/2024/03/01/keolis-commuter-rail-union-agreement Flaherty told the board, describing his colleagues as paid 12% less than Amtrak workers, 16% less than workers at Metro North, and 11% less than workers at New Jersey Transit. The article also implies that Commuter Rail worke...

Re: Lowell Line - Winchester, Woburn, Wilmington Spottings

 by BandA ¦  Sat Mar 16, 2024 12:27 pm ¦  Forum: Pan Am Railways (formerly Guilford Rail System) ¦  Topic: Lowell Line - Winchester, Woburn, Wilmington Spottings ¦  Replies: 613 ¦  Views: 160580

So there is both fiber and railroad signal systems in the ballast. I bet it gets crowded down there eventually.

Re: Rockland Branch Discussion

 by BandA ¦  Fri Mar 15, 2024 3:46 am ¦  Forum: New England Railfan ¦  Topic: Rockland Branch Discussion ¦  Replies: 735 ¦  Views: 185883

Why would they sell the cement plant and create a new or help an existing competitor?

Re: Amtrak Downeaster Discussion Thread

 by BandA ¦  Thu Mar 14, 2024 4:01 pm ¦  Forum: Amtrak ¦  Topic: Amtrak Downeaster Discussion Thread ¦  Replies: 9463 ¦  Views: 2159747

Why would you need an ALC-42E on the downeaster route when any old (passenger) diesel locomotive will do?

  • 1
  • 2
  • 3
  • 4
  • 5
  • 306