Re: Metra Locomotive Assignments And Maintenance

 by metraRI ¦  Sun Aug 01, 2021 1:39 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Metra Locomotive Assignments And Maintenance ¦  Replies: 1437 ¦  Views: 374931

203 was at 14th Street yesterday on a SWS set. Don’t know when it moved over there. Furthering the theory that all of the Winnebagos could ultimately be moved to the BNSF/SWS pool. 191 had a failure recently in which 208 coupled to 8 cars had to pull its consist along with 191 which was coupled to ...

The study area for the extension does not include Aurora. My guess it would stay as-is, and trains traveling west would by-pass Aurora. We are only talking about 2-6 round trips.

Check out the link for more detailed info is posted including renderings of proposed stations.

https://metrarail.com/kendallextension

Re: Alstom Coradia Multilevel Coaches

 by metraRI ¦  Sat Jan 30, 2021 10:07 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Alstom Coradia Multilevel Coaches ¦  Replies: 109 ¦  Views: 19798

I know their options were limited after Nippon Sharyo closed up shop. That said, I would not have been surprised to see Metra simply biding their time until Caltrain started running their new Stadler equipment once the electrification comes online. Then Metra would have just gobbled up some of Calt...

Re: NICTD West Lake Line

 by metraRI ¦  Tue Jan 12, 2021 12:43 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: NICTD West Lake Line ¦  Replies: 46 ¦  Views: 25739

NICTD is expected to enter into a lease agreement for Metra's 26 HL1 (2004-2006) Highliners. They will be rehabbed by Metra for NICTD. Lease term is 15 years.

Re: Penalty For Progress - PTC

 by metraRI ¦  Mon Jan 04, 2021 9:31 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Penalty For Progress - PTC ¦  Replies: 41 ¦  Views: 15102

The number of DOB's and bulletins to be entered into PTC also depends on the territory being ran on. For instance, Metra Rock Island only have a Metra DOB to enter while trains on SWS have to enter Metra, Amtrak, NS, and BRC. Each railroad controls their own PTC portion, so if one doesn't load they ...

Re: Metra Locomotive Assignments And Maintenance

 by metraRI ¦  Mon Nov 02, 2020 7:34 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Metra Locomotive Assignments And Maintenance ¦  Replies: 1437 ¦  Views: 374931

For those who have not heard: Back in town are the final F40Ms, 195 and 213. With that said, this rebuild program is now officially over. I am curious about which locomotives Metra may consider rebuilding next. Any and all plans will undoubtedly be delayed as a result of this pandemic. 100-149 are ...

Re: 75th Street CIP

 by metraRI ¦  Sat Jul 11, 2020 8:31 am ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: 75th Street CIP ¦  Replies: 6 ¦  Views: 15011

Here are the proposed rail maps of what everything should look like at the end of it all. RID Connector: http://www.75thcip.org/files/upload/document_library/Metra_Rock_Island_Connection.pdf Forest Hill: http://www.75thcip.org/files/upload/document_library/Forest_Hill_Junction_and_71st_Street_Crossi...

Re: Chicago area Metra Corona virus adjustments

 by metraRI ¦  Mon Jun 22, 2020 3:27 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Chicago area Metra Corona virus adjustments ¦  Replies: 28 ¦  Views: 6552

Latest round of Service Adjustments adds back some service on the 3 least used lines, including some first time express service.

https://metrarail.com/about-metra/newsr ... es-june-29

Caltrain Storage/Equipment Moves

 by metraRI ¦  Tue Apr 28, 2020 8:21 pm ¦  Forum: California Commuter, Rail Transit, and High Speed Rail (HSR) ¦  Topic: Caltrain Storage/Equipment Moves ¦  Replies: 6 ¦  Views: 1833

I’ve got a few questions for those who know Caltrain operations. Appreciate any input! 1. Where does Caltrain store trains overnight, and how many at each location? Looking at the schedule, I can guess 3 sets are stored in Gilroy, but besides that? 2. Does Caltrain run any deadhead equipment moves o...

Re: Metra Locomotive Assignments And Maintenance

 by metraRI ¦  Wed Mar 12, 2014 11:21 am ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Metra Locomotive Assignments And Maintenance ¦  Replies: 1437 ¦  Views: 374931

Also, 207 had a pretty major mechanical problem on train 419 during the evening rush. It died out at 35th Street and couldn't be restarted. Passengers were transferred to a different train which was pulled by 202. On Monday train #530 also died at 35th Street... with 202. Train was cancelled, passe...

Re: Heritage Corridor yard change?

 by metraRI ¦  Sat Mar 01, 2014 12:15 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Heritage Corridor yard change? ¦  Replies: 3 ¦  Views: 2928

They are still being stored at Western Avenue Yard, however Amtrak no longer wanted them using Track 28/30. In early December they went back to using track 16, requiring them to wait on the south side until the track becomes available.

Re: Construction and Projects

 by metraRI ¦  Wed Jan 29, 2014 9:57 am ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Construction and Projects ¦  Replies: 264 ¦  Views: 111585

I don't think much has been done with the bridges above the expressway since they were lifted into place, but progress is still being made despite the cold weather. Last week bridges above the NS were lifted in place. Most of the focus now is on the embankment to fit the new alignment. Also on the R...

Re: Modeling Chicago Transit

 by metraRI ¦  Thu Jan 09, 2014 2:51 am ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Modeling Chicago Transit ¦  Replies: 42 ¦  Views: 33679

For those who have been waiting, and waiting, and waiting for True Line Trains to release the Metra MP36... its almost here: https://scontent-b-ord.xx.fbcdn.net/hphotos-ash3/s403x403/1560629_496876643765630_821211133_n.jpg https://fbcdn-sphotos-h-a.akamaihd.net/hphotos-ak-prn2/1501371_49687493043246...

Re: Metra Electric Highliner Retirement

 by metraRI ¦  Fri Dec 27, 2013 2:13 pm ¦  Forum: Chicagoland Commuter & Transit ¦  Topic: Metra Electric Highliner Retirement ¦  Replies: 105 ¦  Views: 54469

Martin Baumann wrote:Thanks. How many of the 1501-1660 Highliners are still operational and how many of the new ones are in service?
I don't know the number of old Highliners still in service, however the new units should be into the 1300's by next month. Should be at the point where new equipment is the majority.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 102